Demolition, site work and addition to an educational facility in Hebron, Indiana. Completed plans call for the addition of a 28,218-square-foot educational facility; for the demolition of a educational facility; and for site work for a educational facility.
The Board of Education for MSD of Boone Township is seeking bids for the Hebron High School Addition. MSD Boone Township has contracted Veregy to perform and manage the construction of a new building addition to the existing high school. Veregy will manage and oversee all work related to this project. The contract bid packages will conform to the following guidelines: MSD Boone Township will hire the following work under the Construction Manager (CM) Bid Package directly: Civil, Masonry, Steel Erection, Fire Protection, and Site Utilities, Gym Wall Padding installation, & Sports Equipment. Veregy will serve as the Construction Manager to these bid packages. Veregy will hire directly and manage the following work under a Performance Contract: HVAC, Roofing, Lighting, Electrical, BMS Controls, Electrical installation of Roof Mounted Solar, and the necessary Professional Services for the project. MSD Boone Township will hire a General Contractor (GC) under the CM Bid Package directly. Veregy will serve as the Construction Manager to the GC. The GC will be responsible for the following scopes: General Labor, Plumbing, Exterior & Interior Paint, Store-Front Doors, Rollup Doors, Interior/Exterior Doors, Door Hardware, Gym Flooring, Public Washrooms and Partitions, Locker Room lockers / partitions / washroom accessories /paper dispensers, Fire Extinguishers. The new building addition is 28,218 square feet that will have a two-basketball court gymnasium serving basketball, volleyball, and wrestling. The addition will also include two (2) public washrooms, two (2) locker rooms with capacity for 60 lockers, a wrestling practice room, a remodel of an existing storage room into the new snacks room for the gym, mechanical rooms, and storage rooms. The new addition will connect to the main building, one side against the existing gymnasium, and one hallway connection to an existing main hallway. One (1) set of volleyball floor mounts will be included on each basketball court. One (1) court will be used to place a competition wrestling mat that will be hoisted/elevated for events. Each basketball court will have 4 Hebron High School reserves the right to check qualifications of past projects and performance. Hebron High School reserves the right to accept or reject any or all bids. All questions/RFI s can be submitted in e-mail to Luis Beita Lbeita@veregy.com . All questions/RFIs must be submitted by 5:00 PM CST Friday, October 3, 2025 in order to guarantee a response before bids are due. Custom Project Fire Sprinklers Valley Fire Suppression - 69,600.00 Sports Flooring Jack Laurie Floors - 2,175.00 General Contractor DiverzifyPro - 44,456.00 Civil Larson Danielson - 84,347.00 Sports Equipment Lee Company - 16,251.00 Structural Steel AMG Services - 835,000 Masonry Adams Masonry - 1,290,900 Doors, Frames, Hardware Larson Danielson - 144,396 Painting Larson Danielson - 31,078 Windows Larson Danielson - 74,376 Ceiling Larson Danielson - 54,547 Carpentry Larson Danielson - 107,935 Plumbing Larson Danielson - 383,842 Foundation Larson Danielson - 545,169 Site work Larson Danielson - 136,565 Signage Larson Danielson - 387,164
Bid Results
Educational
$4,207,801.00
Public - City
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2025
November 20, 2025
509 S Main St, Hebron, IN
Related To This Project
Hebron, IN
Bid Date: Jul 14 2025
Hebron, IN
Bid Date: Jun 04 2025
Hebron, IN
Bid Date: Jun 04 2025
Hebron, IN
Bid Date: Apr 02 2025
Hebron, IN
Bid Date: Feb 12 2025
Hebron, IN
Bid Date: Oct 09 2024
Hebron, IN
Bid Date: Jun 13 2024
Hebron, IN
--
Hebron, IN
Bid Date: Jan 18 2024
Hebron, IN
--
Hebron, IN
Bid Date: Jul 14 2023
Hebron, IN
--
Hebron, IN
Bid Date: Feb 21 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.