BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Renovation of a medical facility in Durant, Oklahoma. Completed plans call for the renovation of a medical facility.

The bidder must verify all measurements. Approximately 17,400 sq. ft. of roof and 7,700 sq. ft. of parapet wall. 1. Repair the damaged TPO roofing on the parapet walls and other damaged spots. There is approximately 100 ft. of damaged TPO roofing on theparapet walls. 2. The TPO seams on approximately of the roof have been repaired in the past; the material used to coat the seams has failed. The roof must be thoroughly cleaned of loose debris, and the seams repaired and coated with the 522 coating as per the Weather star application process. 3. The roof coating material will be a Ure-A-Sil (American Weather star) roofing system. If an alternate manufacturer is used, it must be equal to or better in quality. The Bryan County Health Department and the County will need to approve the alternate material and see a sample of the roof material used. The Health Department building must stay open for customers from 8:00 AM to 5:00 PM on weekdays. 5. Care must be taken while working over the front doors for the safety of our clients, possibly before or after business hours. 6. The building must be protected from rain damage while the roof is under construction, both exterior and interior. The contractor will repair any damage at his/her expense. 7. The bidder will supply all labor, materials, equipment, insurance, bonds, permits, and cleanup. Materials can be purchased using the County sales tax number. 8. All pipe and vent penetrations will have new seals installed on the roof. 9. Warranty: No dollar limit, 20 years. Material and workmanship. If an annual inspection is required for the warranty, the yearly cost must be listed on the bid with no increase in the year- to-year cost for the warranty inspection. 10. Payment for the project will be processed after the execution of the warranty. 11. Bidder must possess a current Oklahoma (Construction Industries Board) commercial certificate number and be in good standing. We reserve the right to reject any and/or all bids, or any part thereof. Project: This will be a turn-key roof coating project and roofing-related repairs. The bidder must verify all measurements. Approximately 17,400 sq. ft. of roof and 7,700 sq. ft. of parapet wall Repair the damaged TPO roofing on the parapet walls and other damaged spots. There is approximately 100 ft. of damaged TPO roofing on the parapet walls. 2. The TPO seams on approximately 1/2 of the roof have been repaired in the past; the material used to coat the seams has failed. The roof must be thoroughly cleaned of loose debris, and the seams repaired and coated with the 522 coating as per the Weatherstar application process. 3. The roof coating material will be a Ure-A-Sil (American Weatherstar) roofing system. If an alternate manufacturer is used, it must be equal to or better in quality. The Bryan County Health Department and the County will need to approve the alternate material and see a sample of the roof material used. 4. The Health Department building must stay open for customers from 8:00 AM to 5:00 PM on weekdays. 5. Care must be taken while working over the front doors for the safety of our clients, possibly before or after business hours. 6. The building must be protected from rain damage while the roof is under construction, both exterior and interior. The contractor will repair any damage at his/her expense. 7. The bidder will supply all labor, materials, equipment, insurance, bonds, permits, and cleanup. Materials can be purchased using the County sales tax number. 8. All pipe and vent penetrations will have new seals installed on the roof. 9. Warranty: No dollar limit, 20 years. Material and workmanship. If an annual inspection is required for the warranty, the yearly cost must be listed on the bid with no increase in the yearto-year cost for the warranty inspection. 10. Payment for the project will be processed after the execution of the warranty. 11. Bidder must possess a current Oklahoma (Construction Industries Board) commercial certificate number and be in good standing.

Award

Medical

$86,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
120
Bidding Soon
2,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 6, 2025

Project location map

To Be Determined, Durant, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.