BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a water / sewer project in Greenwood Village, Colorado. Completed plans call for site work for a water / sewer project.

Question Deadline 07/03/2025- Questions regarding the type of Work required may be addressed to M. Aaron Griffin, PE at Kennedy Jenks Consultants (phone number (720) 744-2239; email AaronGriffin@kennedyjenks.com). Requests for information received less than 5 days prior to Bid opening may not be answered. Project located in City of Greenwood Village and unincorporated Arapahoe County, Colorado. The sewer rehabilitation project for Havana Water and Sanitation District encompasses trenchless rehabilitation of approximately 4,050 linear feet (19 segments) of 8-inch and 146 linear feet (1 segment) of 15-inch sanitary sewer mains using cure-in-place pipe (CIPP) lining due to cracks, infiltration, and root intrusions, and miscellaneous manhole repairs, all as described in the Contract Documents. A 10 percent bid bond or certified check payable to Havana Water and Sanitation District shall be submitted with each bid. The Bidder to whom a contract is awarded will be required to furnish "Performance and Maintenance" and "Labor and Material Payment" bonds to the District. The "Performance and Maintenance" and "Labor and Material Payment" bonds shall be furnished in the amount of 100 percent of the contract, in conformity with the requirements of the Contract Documents. The District reserves the right to reject any and all proposals, or to accept that proposal or combination of proposals, if any, which in its sole and absolute judgment, will under all circumstances best serve the District's interest. No proposal will be accepted from any firm, person, or corporation, who is a defaulter as to surety or otherwise, or is deemed incompetent, irresponsible, or unreliable by the District Board of Directors. No bids will be considered which are received after the time mentioned, and any bids so received after the scheduled closing time shall be returned to the bidder unopened.

Award

Water / Sewer

$225,684.00

Public - City

Site Work

8

7

2

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
79
Bidding Soon
1,331
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

September 18, 2025

Project location map

Multiple Locations, Greenwood Village, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.