Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 21, 2026
Site work and new construction of a military facility in Baltimore, Maryland. Conceptual plans call for the construction of a 70,600-square-foot military facility; and for site work for a military facility.
REVISION TO SOURCES SOUGHT NOTICE - 13 APRIL 2026 PATTON HALL NEW STRATEGIC ENGAGEMENT PLATFORM This notice is to inform interested parties of an update to the PATTON HALL NEW STRATEGIC ENGAGEMENT PLATFORM project, originally referenced in Sources Sought Notice W912DR25R17WQ. The Department of the Army has determined that this project will now be funded as a Military Construction (MILCON) project, and the appropriate programming steps are underway. Consequently, the solicitation for this project will be delayed. While the acquisition strategy will remain a Design-Build delivery, the specific method may be revised from Design-Build to Budget (DB2B) to another form, such as Progressive Design-Build. Contractors are advised to monitor this notice for future updates. Should you wish to share your thoughts on these changes or provide any information, please direct ALL questions and correspondence to the following email address: cenab-contracting@usace.army.mil Please be aware that any questions or communications directed to any contact other than the email address provided above will not be addressed. We appreciate your continued interest in this project. The scope of work involves the design and construction of a new 70,600 square-foot Community Club and Conference Center at Joint Base Myer-Henderson Hall, Fort Myer, Virginia. The project will require demolition of Building 214, except for the Jailhouse, which will remain in its current condition after repair of the demising wall. While pool improvements are not required, the work may involve utility connections near the pool area or adjacent improvements that could temporarily impact pool operations. The Design-Build contractor will determine the siting of the new facility, supporting infrastructure such as parking and utilities, and staging within the designated work limits. The procurement will follow a Design-Build to Budget methodology, emphasizing quality, scope, durability, and life-cycle cost within a disclosed budget ceiling. The magnitude of construction is estimated between $50,000,000 and $100,000, and the NAICS code is 236220 for Commercial and Institutional Building Construction. As of February 20, 2026, a design build firm selection has not been released. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Military
$100,000,000.00
Public - Federal
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
10
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2027
To Be Determined, Baltimore, MD
Related To This Project
Baltimore, MD
Bid Date: Nov 06 2025
Baltimore, MD
Bid Date: Nov 13 2025
Baltimore, MD
Bid Date: Oct 14 2025
Baltimore, MD
Bid Date: Oct 15 2025
Baltimore, MD
Bid Date: Nov 06 2025
Baltimore, MD
Bid Date: Jan 20 2026
Baltimore, MD
Bid Date: Oct 24 2025
Baltimore, MD
Bid Date: Nov 05 2025
Baltimore, MD
Bid Date: Dec 09 2025
Baltimore, MD
Bid Date: Oct 13 2025
Baltimore, MD
Bid Date: Sep 26 2025
Baltimore, MD
Bid Date: Sep 26 2025
Baltimore, MD
Bid Date: Nov 06 2025
Baltimore, MD
Bid Date: Oct 10 2025
Baltimore, MD
Bid Date: Oct 29 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
