Published July 18, 2025 at 8:00 PM

Updated July 19, 2025

Site work for a water / sewer project in Grand Canyon, Arizona. Completed plans call for site work for a water / sewer project.

PHANTOM RANCH PERC AREA CYCLIC REPAIRS The Phantom Ranch Percolation/Evaporation Area, designed to infiltrate effluent discharge from the Phantom Ranch Wastewater Treatment Plant (PR WWTP) quickly into the native soil, is not infiltrating properly and the effluent is ponding in the infiltration area. To stop the ponding, increase the infiltration rate, and prevent effluent leakage through the sidewalls, this project proposes to: 1) Work to be done on one percolation area cell at a time. This will allow the PR WWTP to continue to operate. 2) Remove bird netting from current cell being worked on. 3) Remove one section of sidewall planks to allow small excavator access. 4) Excavate the interior sidewall perimeter of percolation area cell and install HDPE liner (see graphic slide #4, #5, & #7) and backfill. 5) Remove the top 2 inches of native soil from the cell being worked on. The removed native soil will be placed against the interior of the sidewall perimeter at 1:1 slope (see graphic slide #5). Install 6" metal landscape edging to retain slope of native soil placed at perimeter. 6) Place 3 inches of #57 gravel over surface of the percolation area using the previously installed landscape edging to define the limit of the gravel. Bed the effluent distribution piping in the 3 inches of gravel (see graphic slide #4 & #6). 7) Cover the 3 inches of gravel with weed barrier cloth (see graphic slide #8). 8) Place another 1 inch of gravel over weed barrier cloth. This will hold the weed cloth in place and prevent solar degradation. 9) Reinstall sidewall planks and bird netting. Bird netting may be damaged when removing. If so, replace in-kind. Repeat process on adjacent percolation area cell. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
3
Bidding Soon
47
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2025

September 1, 2025

Project location map

1576 Shuttle Bus Rd, Grand Canyon, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.