Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 18, 2025 at 8:00 PM
Updated July 19, 2025
Site work for a water / sewer project in Grand Canyon, Arizona. Completed plans call for site work for a water / sewer project.
PHANTOM RANCH PERC AREA CYCLIC REPAIRS The Phantom Ranch Percolation/Evaporation Area, designed to infiltrate effluent discharge from the Phantom Ranch Wastewater Treatment Plant (PR WWTP) quickly into the native soil, is not infiltrating properly and the effluent is ponding in the infiltration area. To stop the ponding, increase the infiltration rate, and prevent effluent leakage through the sidewalls, this project proposes to: 1) Work to be done on one percolation area cell at a time. This will allow the PR WWTP to continue to operate. 2) Remove bird netting from current cell being worked on. 3) Remove one section of sidewall planks to allow small excavator access. 4) Excavate the interior sidewall perimeter of percolation area cell and install HDPE liner (see graphic slide #4, #5, & #7) and backfill. 5) Remove the top 2 inches of native soil from the cell being worked on. The removed native soil will be placed against the interior of the sidewall perimeter at 1:1 slope (see graphic slide #5). Install 6" metal landscape edging to retain slope of native soil placed at perimeter. 6) Place 3 inches of #57 gravel over surface of the percolation area using the previously installed landscape edging to define the limit of the gravel. Bed the effluent distribution piping in the 3 inches of gravel (see graphic slide #4 & #6). 7) Cover the 3 inches of gravel with weed barrier cloth (see graphic slide #8). 8) Place another 1 inch of gravel over weed barrier cloth. This will hold the weed cloth in place and prevent solar degradation. 9) Reinstall sidewall planks and bird netting. Bird netting may be damaged when removing. If so, replace in-kind. Repeat process on adjacent percolation area cell. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Water / Sewer
$500,000.00
Public - Federal
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 17, 2025
September 1, 2025
1576 Shuttle Bus Rd, Grand Canyon, AZ
Related To This Project
Grand Canyon, AZ
Bid Date: Aug 07 2025
Grand Canyon, AZ
Bid Date: Sep 09 2025
Grand Canyon, AZ
Bid Date: Jun 16 2025
Grand Canyon, AZ
Bid Date: Feb 11 2025
Grand Canyon, AZ
--
Grand Canyon, AZ
--
Grand Canyon, AZ
--
Grand Canyon, AZ
--
Grand Canyon, AZ
--
Grand Canyon, AZ
--
Grand Canyon, AZ
Bid Date: Aug 22 2024
Grand Canyon, AZ
Bid Date: Jan 25 2022
Grand Canyon, AZ
Bid Date: Sep 13 2023
Grand Canyon, AZ
Bid Date: May 12 2023
Grand Canyon, AZ
Bid Date: Apr 05 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
