BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 13, 2026 at 8:00 PM

Updated May 15, 2026

Site work and paving for a road / highway in Lakewood, Colorado. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

This project consists of multi-modal safety and pavement improvements along approximately 12.7 miles of the North Rim Road and associated scenic routes. The work is intended to restore roadway infrastructure affected by fire damage and age through pavement preservation activities, including structural patching, asphalt and concrete pavement repairs, and thin overlay treatments to stabilize and extend the service life of existing road surfaces. The project also includes localized drainage and ditch improvements, excavation, placement of riprap, and installation of pipe culverts with end sections to address roadway drainage deficiencies. Roadside safety enhancements are a significant component of the work and include removal and replacement of fire-damaged guardrail systems with new steel-post guardrail, installation of terminal sections, and corridor-wide safety upgrades. Additional scope includes installation of new regulatory and warning signage, pavement markings consisting of solid and broken striping, and placement of delineators to improve visibility and roadway guidance. The project further provides for winter readiness and access control through installation of snow poles, culvert delineators, and road closure gates at side roads and the primary entrance. All work requires coordination of temporary traffic control, maintenance of access, and timely completion within the seasonal construction window, with emphasis on quality pavement preservation, safety improvements, and durable infrastructure upgrades suitable for a high-elevation national park environment. Location: North Rim Road and Scenic Routes, Grand Canyon National Park (North Rim), North Rim, AZ 86023 The Method of Contractor Selection has not been determined at this Time. The estimated price range of the project work is between $5,000,000 and $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Roads / Highways

$10,000,000.00

Public - Federal

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
211
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2027

Project location map

To Be Determined, Lakewood, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.