BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 8, 2025 at 8:00 PM

Updated October 10, 2025

Site work for a civil project in Falher, Alberta. Completed plans call for site work for a bridge / tunnel; and road / highway.

BRIDGE CULVERT INSTALLATION AND OTHER WORK 49:10 B.F. 08320 - Carrying Hwy 49 over a Watercourse, SE of Falher PEACE REGION APPROXIMATE QUANTITIES: 1 Lump Sum Traffic Accommodation for Bridge Construction 1 Lump Sum SPCSP - Supply 1 Lump Sum SPCSP - Assembly 1 Lump Sum Backfill 1 Lump Sum Roadway Work 170 Cubic Metres Heavy Rock Riprap (Class 1) Contractor to supply all materials.

Award

Bridges / Tunnels

$1,296,875.00

Public - State/Provincial

Site Work

4

8

6

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
4
Active Projects
2
Bidding Soon
51
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

September 1, 2025

Project location map

AB-49, Falher, AB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.