BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 20, 2025 at 8:00 PM

Updated August 21, 2025

Renovation of a fire / police facility in Kenosha, Wisconsin. Completed plans call for the renovation of a fire / police facility.

Pre-Qualification: Yes The project includes painting, caulking, removal and replacement of ceiling grid and tiles, removal and replacement of lighting fixtures, HVAC updates, generator updates, sprinkler system testing and repairs and any other incidental items necessary to complete said work as shown on the plans. Coordinate all work with the House Captain, as the Fire Station will remain fully staffed and functional during construction. Shift change occurs daily at 07:15. Regular work hours for construction: M-F 07:15 - 17:00. Any work performed outside the designated regular work hours must be approved by staff. Construction progress meetings required every two weeks. Any needed movement and replacement of existing station appliances, furnishings, wall mounts or decor, etc. during construction. Power and lighting should be maintained in the station for daily functions. Drop cloths or coverings should be used to protect finished surfaces and furnishings during construction. Any damage to finished surfaces or furnishings caused by contractors during the construction process will be repaired by or replaced at the cost of the contractor. Storage of dumpsters and construction equipment is to be coordinated with the House Captain. Provide cleaning during and at the end of construction. The station will remain in use during construction. Any necessary permitting or required documentation. The project will be bid with a 15% budget contingency. All products identified are the basis of design and substitutions may be allowed if request is submitted prior to bid and approved. The original station planset (hard copy) is available for reference on-site. Please view the attached planset in color print for detail.

Award

Fire / Police

$138,600.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
245
Bidding Soon
3,370
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 15, 2025

Project location map

625 52nd St, Kenosha, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.