BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 8, 2025 at 8:00 PM

Updated July 9, 2025

Site work for a water / sewer project in Ship Bottom, New Jersey. Completed plans call for site work for a water / sewer project.

The total project includes the following: Removal and replacement of approximately 2,875 LF of existing water main with 8 inch Class 52 Ductile Iron Pipe with Push On type joints; removal, replacement and installation of approximately 2,720 LF of water services; replacement and installation of 5 hydrants; installation of approximately 9 gate valves; approximately 3,985 SY of Initial Municipal/County Pavement restoration, approximately 5,950 SY of Final Municipal/County Pavement restoration, and all required testing, disinfection, restriping, traffic control and landscaping. The project also includes the replacement of seventeen (17) additional galvanized water services as outlined in Special Conditions, Item 30. AND SFY 2024 Sewer Main Replacement Project - New Jersey Infrastructure Bank, Project: Removal and replacement of approximately 2,700 LF of existing sanitary sewer pipe with 8-inch PVC SDR 26 sanitary sewer pipe, removal and replacement of approximately 2,800 linear feet of sanitary sewer lateral wyes and connect to existing lateral; removal and replacement of approximately 13 sanitary sewer manholes; removal and replacement of approximately 4,115 SY of initial Municipal/County pavement restoration; removal and replacement of approximately 6,170 SY of Final Municipal/County pavement restoration, and all required fittings, dewatering, restriping, traffic control and disturbed landscaping areas. Project award will be made to the lowest responsible bidder within 60 days of the bid opening. A BID BOND drawn to the order of the Borough of Ship Bottom in an amount equal to ten (10%) percent of the amount of the Bid, but no more than $20,000.00, must be submitted with the proposal as BID SECURITY, pursuant to Local Public Contract Law (LPC) 40A:11-21. Bids may be submitted by mail or in person at any time prior to the time for receiving and opening the same. Bidders are required to comply with N.J.S.A 10:5-31 et seq.and N.J.A.C.. 17:27. The successful lowest responsible Bidder must comply with all provisions of N.J.A.C.7:22-9.1 ET SEQ., Rules and Regulations for Awarding Contracts for State Assisted Projects to Small Business Concerns Owned and Controlled by Economically Disadvantaged Individuals (included within). The successful lowest responsible Bidder shall comply with the project plan developed by the sponsor to fulfill SED utilization requirements, as defined in the Small Business Act 15 U.S.C. 637(a) and 637 (d), and any regulations promulgated pursuant thereto. Bidders are required to comply with the requirements of P.L. 1975, c.127. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Bid Results

Water / Sewer

$2,605,654.00

Public - City

Site Work

24

9

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
15
Bidding Soon
2,303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

Multiple Locations, Ship Bottom, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.