BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Renovation of a transportation facility in Stillwater, Oklahoma. Completed plans call for the renovation of a transportation facility.

Baggage Handling System (BHS) Contractor to supply & install inbound and outbound BHS. Outbound shall include multiple powered conveyors, roller conveyors, liftgate, security doors, MCP panels and impact protection. Inbound shall include a single flat plate claim device. These shall be installed in both secure and public areas. BHS contractor to install and program BHS controls to operate the system. BHS contractor shall coordinate all electrical power requirements with the Construction Manager at Risk (CMAR) for the Terminal Building. BHS Contractor and CMAR shall coordinate installation with TSA for integration of EDS machine. BHS Contractor shall install BHS in the new terminal at the location shown in the contract documents dated June 2, 2025. Each bidder is required to submit with their bid a guarantee in the form of an acceptable bidder's bond and in the amount of not less than five percent (5%) of the amount bid. The successful bidder shall file a performance bond, maintenance bond, statutory bond and certificates of insurance in the statutory amounts for public liability and workers compensation insurance at the time of signing the contract. The Council reserves the right to reject any or all bids or portions thereof and to waive any technicalities in the bidding process. Any bid received by the City Clerk more than ninety-six (96) hours, excluding Saturdays, Sundays and holidays, before the time set for the opening of bids, or any bid so received after the time set for opening of bids, shall not be considered and shall be returned unopened to the bidder submitting same.

Post-Bid

Transportation Terminals

Public - City

Renovation

24

11

6

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Installer Qualifications, Temporary Facilities and Controls, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Haul Routes, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Commissioning
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, Air Duct Accessories, Dampers
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Site Improvements, Screening Devices
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Construction and Equipment, Transportation Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Conveyors, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
76
Bidding Soon
983
All Active Projects
520
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

img_map_placeholder

2020-1 W Airport Rd, Stillwater, OK

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.