Published August 20, 2025 at 8:00 PM
Updated August 21, 2025
Site work for a mixed-use development in Gouverneur, New York. Completed plans call for site work for a educational facility; and parking garage.
Capital Improvement Phase 2 - Contract No. 7 Geothermal Well Fields Work under this Contract may generally be described to include, but not be limited to the following: Procurement and general requirements; and all other work and related materials as indicated on the Contract Drawings, as specified herein, and as required for the complete and proper execution of the Work This outline is a general indication of the requirements of this Contract and is not intended to be all inclusive. The complete Contract Documents in their entirety, to include any and all addenda, form the basis of the responsibility of this Contract. Each contractor is advised that the specification sections in Division 01-General Requirements apply distinctly to each Prime Contractor and the balance of the technical specifications apply to each Contractor (as appropriate) for the accomplishment of his work. All work of this contract shall be coordinated with other Prime Contractors involved in the project. All work shall additionally be coordinated with all other activities, construction, or others at each site throughout the progress of the work of this project. The General Contractor shall use all means possible and shall be responsible for coordinating the installation of all materials of this Contract with work of all other trades involved with this project. All work shall be done in strict accordance with the Contract Documents and in compliance with all applicable Local, State and Federal Codes. Prior to the Bid Date of this project, the Contractor shall be completely responsible for visiting the project site to become completely familiar with the scope of this project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. It shall be completely understood that the use of asbestos containing materials in this project is strictly forbidden and all materials are provided in accordance with the Federal Asbestos Hazard Emergency Response Act (AHERA), and the New York State Asbestos Safety Act (SASA). In addition to those items in the Base Bid, the General Contractor shall further sub-divide his bid proposal as described in the following bid items, alternates, and/or unit prices. The General Contractor shall include in the Base Bid all of the work of this Contract not specifically described in a Bid Item or Alternative. The Owner reserves the right to accept any and/or all of the Bid Items and/or Alternates or any combination thereof and to waive any informalities or defects in the bid proposals either before or after opening. This work is to be bid under a MULTIPLE CONTRACT system covering the work of all trades under separate contracts as follows: Contract No. 1-General Construction. Any bid may be withdrawn without prejudice prior to the official bid submission time or any publicized postponement thereof. Bids shall be prepared as set forth in the Information to Bidders, enclosed in a sealed envelope bearing on its face the name, address and phone number of the bidder and the title of the project. Each bidder agrees to waive any claim it has or may have against the Owner, the Architect/Engineer, and the respective employees, arising out of or in connection with the administration, evaluation or recommendation of any bid. Each bidder must deposit with his bid, security in the form and subject to the conditions provided in the "INFORMATION FOR BIDDERS". Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and to the minimum wage rates to be paid under the Contract. No bidder may withdraw his bid within 45 business days after the date of the opening of bids. The Owner further reserves its right to disqualify bidders for any material failure to comply with the Information for Bidders and General, Supplementary, and Special Conditions. The Owner reserves the right to reject any or all bids and to waive any informalities or defects in such bid either before or after opening. SED Control Nos. 51-11-01-06-0-003-013 Elementary School 51-11-01-06-0-006-014 West Side Middle School 51-11-01-06-0-007-016 Senior High School 51-11-01-06-5-011-007 Bus Garage 51-11-01-06-7-020-001 Pole Barn Project Locations: Senior High School 133 East Barney St. Gouverneur, New York 13642 West Side Middle School 25 Wilson St. Gouverneur, New York 13642 Elementary School 111 Gleason St. Gouverneur, New York 13642 Bus Garage 111 Gleason St. Gouverneur, New York 13642 Cold Storage Building 111 Gleason St. Gouverneur, New York 13642 Construction and renovations of the Gouverneur Central School District Senior High School, West Side Middle School, Elementary School, Bus Garage and Cold Storage Building inclusive of but not limited to associated sitework, underground utilities, pavements, selective demolition hazardous material removal, building construction work, plumbing work, HVAC work, geothermal well field work and electrical work. PN_2024-006 T.P.N. - 173.024-5-20 T.P.N. - 173.024-4-5 Project No. -- 23.04 PLANS AND SPECIFICATIONS REMAIN THE PROPERTY OF BCA Architects & Engineers AND PRINTED MUST BE RETURNED IN GOOD CONDITION WITHIN THIRTY (30) BUSINESS DAYS AFTER AWARD OF CONTRACT OR REJECTION OF BIDS. The plan deposit for one set of Plans and Specifications will be refunded to bona fide bidders returning Plans and Specifications to BCA Architects & Engineers within 30 business days after award of Contract or rejection of bids. A partial refund of the plan deposit, in an amount equal to the full amount of such deposit, less the actual cost of reproduction of the Plans and Specifications shall be made to nonbidders and unsuccessful bidders for the return of all other copies of the Plans and Specifications in good condition within 30 business days following the award of the Contract or the rejection of the bids. Question Deadline 07/23/2025 All requests for such interpretations shall submitted in writing to BCA Architects & Engineers (on the attached RFI Form). To be given consideration a request for interpretation the RFI form must be received at least four (4) business days prior to the date fixed for the opening of bids RFI’s will no longer be accepted or answered after 1:00pm on Thursday, July 31st, 2025.
Award
Educational
$3,206,462.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
September 8, 2025
Multiple Locations, Gouverneur, NY
Related To This Project
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
Bid Date: Aug 05 2025
Gouverneur, NY
--
Gouverneur, NY
Bid Date: May 19 2025
Gouverneur, NY
Bid Date: May 19 2025
Gouverneur, NY
Bid Date: Mar 18 2020
Gouverneur, NY
Bid Date: May 20 2025
Gouverneur, NY
Bid Date: May 20 2025
Gouverneur, NY
Bid Date: May 20 2025
Gouverneur, NY
Bid Date: May 20 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.