Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 11, 2025 at 8:00 PM
Updated August 12, 2025
Site work for a playground / park / athletic field in St George, Utah. Completed plans call for site work for a playground / park / athletic field.
The City of St. George is requesting bids for construction of the Southern Hills Park. The bid includes the following: removals, earthwork, site grading, drainage, utilities, concrete flatwork, raised planters, restroom, pavilion, parking lot, pedestrian bridge, landscape, irrigation, and other related work items. Project Address: 2025 E White Dome Drive, St. George, UT 84790 Removals, earthwork, site grading, drainage, utilities, concrete flatwork, restroom building, pavilion, stamped concrete flatwork, raised planters, grass sod area, parking lot, pedestrian bridge, rockery walls, landscaping, irrigation, and other related work items. Project MAY include an asphalt walking path and/or an additional concrete slide area contingent on available budget. Every BID shall be accompanied by a bid bond in the amount of 5% of the BID, naming the City of St. George as obligee, this bid bond must be issued by a surety company licensed to do business in the State of Utah and be on a bond form acceptable to the City of St. George. Question Deadline 07/10/2025 at 2:00 PM MT Online Portal . Questions During the Bid Period: Questions regarding the Southern Hills Project shall be directed in writing to Ryker Jensen rjensen@civilscience.com and Ryan Devitt rdevitt@civilscience.com The 100% performance - labor and materials bond will be required on this project. The City of St. George reserves the right to reject any or all PROPOSALS or to waive any formality or technicality in any PROPOSAL in the interest of the city. It is the CITY'S intention to commence construction no later than August 18, 2025 and to complete the project no later than December 16, 2025 Additive Alternates: There are two Additive Alternate Bid Schedules: a. Additive Alternate 1 - Asphalt Trail. This is to extend the trail from the northeast end of the proposed grass area then east along White Dome Drive and associated landscaping and irrigation. b. Additive Alternate 2 - Additional Playground Areas. Includes three concrete slides, concrete flatwork, stairs, rails, and playground curb. Playground equipment and artificial turf surfacing by others. Construction Estimate: $2,000,000.
Award
Playgrounds / Parks / Athletic Fields
$1,711,514.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
August 18, 2025
2025 E White Dome Drive, St George, UT
Related To This Project
St George, UT
Bid Date: Jul 09 2025
St George, UT
Bid Date: Jul 23 2025
St George, UT
--
St George, UT
--
St George, UT
Bid Date: Jul 22 2025
St George, UT
Bid Date: Jul 02 2025
St George, UT
Bid Date: Feb 17 2021
St George, UT
Bid Date: Feb 18 2021
St George, UT
Bid Date: Mar 11 2021
St George, UT
Bid Date: Jun 16 2025
St George, UT
Bid Date: Jun 24 2025
St George, UT
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
