Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and paving for a road / highway in Peaceful Village, Missouri. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
Safety Improvement Project Project Length: 1.6 miles Consultant Services Required: Roadway, Surveying, and Environmental Consultant shall be responsible for professional engineering services including the preparation of preliminary plans, right-of-way and easement plats, final construction plans, technical specifications and construction cost estimation. As part of preparing the plans the consultant may need to perform field surveys, archaeological or environmental studies and geotechnical investigations. The consultant shall also be responsible for a limited number of construction engineering services including staking of new right-of-way corners, setting of pins post-construction, review of shop drawings and material certifications, perform any needed drawing revisions and respond to requests for information from both the Contractor and the County. The method of Contractor Selection has not been Determined at this time. MO DOT - RFQ Engineering - Hillsboro Valley Park Road Safety Improvement Project
Conceptual
Roads / Highways
$2,500,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
1
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 13, 2026
Williams Creek Rd & Hillsboro Valley Park Rd, Peaceful Village, MO
Related To This Project
Maplewood, MO
Bid Date: Jun 17 2025
Kansas City, MO
--
Saint Louis, MO
Bid Date: Jul 16 2025
Nixa, MO
Bid Date: Jul 23 2025
Branson, MO
Bid Date: Jul 29 2025
Eagleville, MO
Bid Date: Jul 09 2025
Diamond, MO
Bid Date: Aug 07 2025
Nixa, MO
Bid Date: Jul 17 2025
Jackson Township, MO
Bid Date: Jun 26 2025
Mexico, MO
Bid Date: Jul 21 2025
Wildwood, MO
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.