Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a mixed-use development in Saint Louis, Missouri. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000391235 upgrades to the South Parking Lot with two coats of sealer, striping, replacement of portion of bad asphalt, and placement of 100 parking stops. Exact placement is to be determined with the Project Manager. This project will be accomplished in two phases in order to continually keep a portion open to the public. Work can only begin after September 1, 2025. Remove and Replace 4" Asphalt The area of consideration is approximately 20 square yards of deteriorated pavement. This will need to be removed. Replace with 2 inches of base mix asphalt and rolled to proper compaction. Install 2 inches of hot surface mix asphalt, blending and tapering as necessary, roll to proper compaction. 2. Hot Rubberized Crack Sealing (PLS) Approximately 26,000 Linear Feet Cracks are to be blown out and debris removed with the aid of crack cleaning equipment appropriate for the job. Upon completion of the crack preparation, rubberized hot pour elastic crack sealer will be used to seal the cracks, and be followed immediately by a finish tool to level the material in a narrow band across the cracks. 3. Seal Coating The area under consideration is approximately 30,427 square yards. All surfaces should be cleaned of loose material, weeds, grass and dirt so that the sealer will adhere to the existing surface. a. This work will need to be done in two phases, approx. 50% to be done in each phase. b. The material to use should be MAC 52 Coal Tar Sealer as a "two coat process". c. The first coat is to be applied with a squeegee. d. The second coat can be applied with a squeegee or by being sprayed. Any submitted proposal shall remain valid and subject to acceptance for ninety (90) days after the proposal due date. 4. Line Striping-Layout and stripe the parking lot area as per the existing layout with one coat of traffic marking paint. 5. Wheel Stops- Provide and install 100 new 6' concrete wheel stops where needed. Question Deadline 07/10/2025 at 11:59 PM CT Questions are submitted online No .Questions concerning this solicitation shall be submitted via email to Candace Bingham, CSDP, Director of Procurement and Supplier Engagement at cbingham@stlzoo.org.

Award

Sidewalks / Parking Lot

$63,550.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
196
Active Projects
108
Bidding Soon
1,265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

September 1, 2025

Project location map

1 Government Dr, Saint Louis, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.