BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2025 at 8:00 PM

Updated September 4, 2025

Demolition, site work, paving and renovation of a mixed-use development in Saint Louis, Missouri. Completed plans call for the demolition of a sidewalk / parking lot; for the renovation of a sidewalk / parking lot; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; transportation facility; transportation facility; and sidewalk / parking lot.

**As of September 3rd, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Project No. A24130.00075.001 All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of Work of a similar character in the City of St. Louis as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher, including the general prevailing rate for legal holiday and overtime Work. Question Deadline 07/07/2025 at 5:00 PM CT. The City of St. Louis hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, age, religion, sex, familial status, disability, sexual orientation, gender identity or expression, national origin, or ancestry in consideration for an Award. Contractors and sub-contractors who sign a contract to work on public works project must provide a 10 - Hour Occupational and Safety and Health Administration (OSHA) construction safety program or similar program approved by the Department of Labor and Industrial Relations to be completed by their on-site employees within 60 days of beginning work on the construction project. The proposed Work includes the demolition and removal of (14) buildings and (1) water tank at the Missouri Air National Guard (MOANG). All foundations will remain intact for those structures, except the Credit Union. All utilities will be disconnected and capped. All above ground improvements and vegetation will be removed. Existing fencing will be removed, and new fencing and gate will be installed.

Bid Results

Transportation Terminals

$2,174,592.00

Public - City

Demolition, Paving, Renovation, Site Work

83

17

9

4

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

September 15, 2025

Project location map

10701 Lambert International Blvd, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.