Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 26, 2025 at 8:00 PM
Updated August 27, 2025
Site work, paving and renovation of a mixed-use development in Saint Louis, Missouri. Completed plans call for the renovation of a parking garage; for site work for a transportation facility; parking garage; and for paving for a transportation facility.
The City of St. Louis Board of Public Service ("BPS") is soliciting Statements of Qualifications ("SOQs") from qualified firms interested in providing Construction Manager at Risk ("CMAR") services for the Consolidated Terminal Program ("CTP") at St. Louis Lambert International Airport (the "Airport"). Concurrent with the CTP, BPS will construct Airport roadways and an Airport parking garage containing a ground transportation center ("Project", or "Garage/Roadways Project"). BPS seeks a CMAR team, comprised of a prime firm or a joint venture, to provide Preconstruction and Construction-Phase Services for the Garage/Roadways Project at the Airport. This Request for Qualifications ("RFQ") outlines the Airport's selection process and defines the information prospective CMAR applicants must submit. The selected CMAR shall provide all preconstruction and constructionphase services for the Project, as generally outlined in this RFQ. All work shall comply with all applicable federal, state and local laws, codes, ordinances, Federal Aviation Administration requirements, Missouri Department of Transportation and STLAA standards, design criteria, rules, regulations, and Authorities Having Jurisdiction ("AHJ"). The selected CMAR shall properly execute the Project, and provide a fully-functioning garage and multiple roadways for the Airport. The CMAR's services shall include demolition and/or relocation of existing improvements and utilities, as necessary to construct and utilize the new and renovated facilities The new Consolidated Terminal Parking Garage will include the following elements: 1. 7,200 +/- vehicle parking spaces. 2. GTC to accommodate city and charter buses, taxis, limousines, transportation network companies (TNC), and shuttles. 3. GTC shelters for passengers, with appropriate climate control. 4. Revenue control infrastructure, including toll booths. 5. Revenue control operating system. 6. Automated Parking Guidance System. 7. EV Charging Stations. 8. Lighting. 9. Roof solar panels. 10. Roof structure. 11. Mechanical, electrical, and plumbing infrastructure to support a functioning facility. 12. Vertical transportation. 13. Fire protection. 14. Drainage. 15. Landscaping. 16. Wayfinding. 17. Remote passenger check-in kiosks infrastructure. For all Preconstruction and other professional services, in accordance with the City of St. Louis Ordinance No. 70767, the CMAR shall have a goal of awarding subcontracts totaling 25% of the CMAR's Contract Sum to Minority-Owned Business Enterprises, and 5% of the CMAR's Contract Sum to Women-Owned Business Enterprises. All questions relating to this RFQ shall be directed to Helen Bryant, Board of Public Service, by e-mail at bryanth@stlouis-mo.gov (reference Project name in Subject Line if sending an e-mail). Answers to technical questions will be provided to CMAR applicants who have registered to download the RFQ from the BPS website, or who have provided contact information when they received this RFQ. Project Goal: 25% MBE / 5% WBE
Post-Bid
Parking Garage
$600,000.00
Public - City
Paving, Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2025
December 23, 2025
10701 Lambert International Blvd, Saint Louis, MO
Related To This Project
Saint Louis, MO
Bid Date: Aug 14 2025
Saint Louis, MO
Bid Date: Jul 01 2025
Saint Louis, MO
Bid Date: Jul 15 2025
Saint Louis, MO
Bid Date: Sep 09 2025
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jul 16 2025
Saint Louis, MO
Bid Date: Jun 30 2025
Saint Louis, MO
Bid Date: Jul 22 2025
Saint Louis, MO
Bid Date: Aug 02 2021
Saint Louis, MO
--
Saint Louis, MO
Bid Date: Jun 20 2025
Saint Louis, MO
Bid Date: Jun 20 2025
Saint Louis, MO
Bid Date: Jul 18 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
