Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 27, 2025 at 8:00 PM
Updated June 28, 2025
Site work and new construction of a mixed-use development in Jefferson, Georgia. Completed plans call for the construction of a educational facility; and for site work for a educational facility.
Design/Build (D/B) services for the construction of Covered Multi-Purpose Facility located at 325 Memorial Drive Jefferson, GA 30549. Questions must be received by July 18, 2025. A list of questions and answers will be provided to all known D/B and by request via. Addendum. Eddie Hicks Facilities Coordinator 345 Storey Lane Jefferson, Georgia 30549 eddie.hicks@jeffcityschools.org GENERAL PROJECT INFORMATION Project Description: The Jefferson City Board of Education is requesting individual sealed Proposals for furnishing all materials, labor, tools, equipment and appurtenances necessary to construct the Jefferson High School Facilities project. Project Delivery Method The Delivery Method for the Project will be a Design/Build (D/B), During pre-construction, the D/B will be responsible for the designing, construction, pricing, value engineering, as well as maintainability and construct ability issues. The Jefferson City Board of Education (Owner) is soliciting proposals from Construction Professionals/firms interested in providing Design/Build (D/B) services for the construction of the above listed project in Jefferson, Georgia. This Request for Proposals (RFP) seeks to identify potential providers of the above-mentioned services. All respondents to this RFP are subject to instructions communicated in this document and are cautioned to completely review the entire RFP and follow instructions carefully. The Owner reserves the right to reject any proposals, and to waive technicalities and informalities at their discretion. Project Schedule The selection of the D/B is anticipated to be finalized on July 31, 2025. Design and preconstruction services are expected to begin immediately upon execution of the contract with the D/B. Construction services expected to begin upon contract execution. (All of the dates herein are estimates which are subject to change.) The work described will begin in August 2025 and completed as per schedule. The Jefferson City Board of Education reserves the right to reject all proposals and to waive technicalities. Install all equipment per plans and manufacturer specifications. Coordinate all work with other trades and maintain compliance with all applicable codes and standards. Include LED lights per Engineer Design. Permit with all local authorities. Design all foundations and furnish and install 3000 PSI concrete or what is required by the Structural Engineer. No Construction or Footings can interfere with the existing turf field or existing concrete apron on the turf field. Include $200,000.00 for contingency for rock. Include Civil Design if required. Columns shall be straight up to 10'-0" before taper. Provide protection column pads on all four sides of columns up to 10'-0" Include 45lbs of soil cement per square yard in turf area at required sub grade. Provide design/build for synthetic turf under covered facility.
GC Bidding
Educational
$800,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2025
August 1, 2025
325 Memorial Dr, Jefferson, GA
Related To This Project
Jefferson, GA
Bid Date: Apr 16 2019
Jefferson, GA
--
Jefferson, GA
Bid Date: Aug 21 2025
Jefferson, GA
--
Jefferson, GA
Bid Date: Aug 28 2025
Jefferson, GA
Bid Date: Sep 25 2025
Jefferson, GA
Bid Date: Jun 17 2025
Jefferson, GA
Bid Date: Jun 20 2025
Jefferson, GA
Bid Date: Jun 05 2025
Jefferson, GA
Bid Date: Apr 29 2025
Jefferson, GA
Bid Date: May 13 2025
Jefferson, GA
Bid Date: May 15 2025
Jefferson, GA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
