BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Renovation of a mixed-use development in Tucson, Arizona. Completed plans call for the renovation of a 25,566-square-foot, one-story above grade fitness / recreation center; and power facility.

Job No. TU0215-21428496 The Pascua Yaqui Tribe will receive proposals from qualified licensed/registered Photovoltaic Power Generation System Installation contractors with experience in commercial facility scale PV systems, for the Pascua Yaqui Tribe Wellness Center Photovoltaic Solar System 2025 Project. This project is located on the Pascua Yaqui Reservation at the Wellness Center Facility. Project Address is 5305 Calle Torim, Tucson AZ 85757, Questions, Clarifications, Deviations: Process for vendors to submit questions. i) Questions and deviation requests shall be submitted to the contracting officer via email at pco@pascuayaqui-nsn.gov. Verbal requests for clarification or information or interpretation will not be accepted a) Detailed Requirements: Technical, functional, business, mandatory, and qualification requirements. i) Cantilever style metal structure to provide a covered pedestrian walkway and to mount the photovoltaic modules and overhead pedestrian lighting. ii) Estimated target solar energy system size: 150.00 kW iii) System shall have cloud-based performance data monitoring capability. iv) All engineered systems including the PV system and the metal structure and foundations shall be engineered by a licensed professional. All engineering documents and calculations shall be sealed by a licensed engineer. v) Contractor is responsible for filing and acquiring all permits, reviews, and inspection with the respective authority having jurisdiction. vi) All work is to comply with the current adopted codes by Pima County Development Services. More information can be found at Development Services | Pima County, AZ vii) Contractor is responsible for completing all applicable incentive/rebate applications for the Owner. viii) Exposed solar power cables and branch electrical for power or lighting shall be installed in conduit. ix) All wiring is to be installed by a licensed electrician familiar with solar PV system installations. x) The PV generation system will directly tie into the Wellness Center electrical system. See included as-builts. xi) Cable runs from array to building shall be buried in underground conduits. xii) Contractor shall saw cut, trench, backfill and patch back concrete as necessary to complete the installation. xiii) Contractor to provide all necessary programming xiv) Contractor to provide all low voltage/ethernet cabling from system to IT switch as necessary for cloud monitoring or programming. xv) Contractor to assist with warranty registration and provide Operation and Maintenance Manuals for all components and systems. xvi) Contractor to prepare as-built drawings of the system or Owner record.

Post-Bid

Solar Power Generation

$4,000,000.00

Public - Federal

Renovation

295

5

2

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
15
Active Projects
1
Bidding Soon
143
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2025

September 1, 2025

Project location map

5305 Calle Torim, Tucson, AZ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.