Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work and paving for a road / highway in Cream, Wisconsin. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The pavement needs to be replaced. Rehabilitation project to replace the pavement of approximately 1.78 miles of USH 10 from CTH A to 1508' east of STH 37 N in the City of Mondovi in Buffalo County. Replace the pavement with 8" of PCC pavement. Additional work includes replacing curb & gutter, storm sewer systems, sidewalks, decorative street lighting, replacing approach slabs at Peeso Cr. bridge, pavement markings, moving signs, and curb ramps. The City of Mondovi will be replacing sanitary sewer and water main, including all services to adjacent properties, in conjunction with this project. The City will complete its own plans with a separate project ID, but the WisDOT consultant will need to incorporate those plans into the WisDOT PS&E. The work will be completed under full roadway closure with detour and possible local traffic detoured on adjacent city streets. Consider temporary accommodations for pedestrians Anticipated Project Start Date: 12/30/2025 Anticipated Project Completion Date: 06/03/2030 Anticipated Construction Cost: $11,000,000-$11,999,999 DBE goal: DBE goal in $ 0.00 The Method of Contractor Selection Has Not Been Determined at This Time. WIDOT - NW-03 - RFP Engineering - Rehabilitation - Pavement Replacement - USH 10 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Conceptual
Roads / Highways
$11,999,999.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 30, 2025
USH 010E, Cream, WI
Related To This Project
Cream, WI
Bid Date: Mar 10 2026
Black River Falls, WI
--
Chippewa Falls, WI
--
Milwaukee, WI
Bid Date: Jul 10 2025
Milwaukee, WI
Bid Date: Jun 26 2025
Adams, WI
Bid Date: Jul 31 2025
Salem, WI
Bid Date: Jul 21 2025
Menomonie, WI
Bid Date: Aug 14 2025
Suamico, WI
Bid Date: Jul 28 2025
Eau Claire, WI
Bid Date: Jul 08 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
