Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2025 at 8:00 PM
Updated September 16, 2025
Remodeling and renovation of a water / sewer project in Crocker, Missouri. Working plans call for the remodel of a water / sewer project; and for the renovation of a water / sewer project.
**As of September 15th, 2025, bids was rejected. No definite date for the rebid.** Preliminary Project Summary: Remodel existing City Wastewater Treatment Facility including new headworks, rotors, clarifier, u.v. system, electrical, and appurtenances. Each bidder must deposit with his bid security in the amount, form and subject to the conditions provided in the Information for Bidders. Preliminary Range of Expected Probable Construction Costs is: $2,600,000 to $3,500,000 Attention of bidders is particularly called to the requirements as to conditions of employment to be observed and Davis Bacon and/or State Prevailing wage rates to be paid under the contract, Segregated Facility, Section 109, and E.O. 11246. MBE and WBE and Section 3-DBE bidders are encouraged to bid. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Nondiscrimination In Employment: Bidders on this work will be required to comply with the President's Executive Order Number 11246. Requirements for Bidders and Contractors under this order are explained in the Information to Bidders. The project is being financed through the Missouri State Revolving Fund, by the Water and Wastewater Loan Revolving Fund and federal Capitalization Grants to Missouri. The City of Crocker is an Equal Opportunity Employer and invites the submission of bids from Disadvantaged Business Enterprises. The Owner reserves the right to waive any informalities or to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 07/24/2025 The ARCHITECT or ENGINEER will consider such questions submitted in writing at least five (5) days prior to BID opening. If the question includes the equality or use of products or methods, it must be accompanied by DRAWINGS, SPECIFICATIONS, and any other necessary data to allow the ENGINEER to make a decision regarding the equality of the product or methods
Final Planning
Water / Sewer
$6,971,400.00
Public - City
Remodeling, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2025
March 16, 2026
To Be Determined, Crocker, MO
Related To This Project
Crocker, MO
Bid Date: Sep 19 2025
Crocker, MO
--
Nixa, MO
--
Imperial Township, MO
--
Peaceful Village, MO
--
Maplewood, MO
Bid Date: Jun 17 2025
Kansas City, MO
--
Saint Louis, MO
Bid Date: Jul 16 2025
Nixa, MO
Bid Date: Jul 23 2025
Branson, MO
Bid Date: Jul 29 2025
Eagleville, MO
Bid Date: Jul 09 2025
Diamond, MO
Bid Date: Aug 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
