BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 11, 2025 at 8:00 PM

Updated July 12, 2025

Renovation of a playground / park / athletic field in Dutch John, Utah. Completed plans call for the renovation of a playground / park / athletic field.

All materials, labor, and supervision to complete the Jarvie Ranch Electrical Distribution Rehabilitation. Delivery: 90 Days After Notice FAR Magnitude: Between $25,000 and $100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Questions Due Date: 24 June 2025 / 2PM Mountain Time - All questions should be emailed directly to the contracting office primary POC Andrea Harter, aharter@blm.gov A. Work for this project requires the contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the following: 1. Removal of the existing wood utility build housing all the existing electrical disconnects and panels. Remove the debris from Government property. 2. Notification to the electrical utility company to remove the two existing 200-amp single phase electrical service and replace them with one 400- amp single phase electrical service mounted on a new external channel rack located approximately 10 feet from the existing utility pole. Contractor to coordinate with utility company and is responsible for all utility company fees associated with the new service. 3. Installation of an underground electrical vault to intercept all the existing underground electrical conduits that feed the electrical sub-panel throughout the complex. 4. Perform all work per the latest edition of the NFPA 70 and the ICC Building Codes. This project is located at the John Jarvie Historic Ranch located on Browns Park Road, Dutch John, Utah 84023. Directions to the site From Vernal, UT (via Clay Basin), North 35 miles on Highway 191, turn right to stay on Highway 191, travel 18 miles to the Wyoming- Utah border, turn east onto Browns Park Road and travel for 20.2 miles after descending into Browns Park, turn right at Red Creek and travel approx.. 1.7 miles until arrival at the site.

Post-Bid

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - Federal

Renovation

7

9

2

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
6
Bidding Soon
97
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 8, 2025

Project location map

Browns Park Rd, Dutch John, UT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.