Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 23, 2025 at 8:00 PM

Updated September 24, 2025

Site work and paving for a mixed-use development in Cottonwood, Arizona. Completed plans call for site work for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Project No: 0000 YV CWD T0552 01C 0000 YV CWD CWD-0-(204)T City of Cottonwood (Main St 10th St - SR 89A) The proposed project is located in Yavapai County within the City of Cottonwood. The work consists of pedestrian improvements on Main Street from 10th Street to SR 89A. The work includes reconstructing portions of the existing sidewalk, sidewalk ramps, and driveways along this 1.3-mile segment of Main Street to provide continuity for pedestrians. The works also includes landscape restoration, re-striping, and other related work. The time allowed for the completion of the work included in this contract will be 85 working days. The minimum contract-specified goal for participation by Disadvantaged Business Enterprises in the work, as a percentage of the total amount bid, shall be 6.00. The Application for Contractor Prequalification may be obtained from the Contracts and Specifications website. A proposal guaranty in the form of either a certified or a cashier's check made payable to the State Treasurer of Arizona for not less than 10 percent of the amount of the bid or in the form of a surety (bid) bond for 10 percent of the amount of the bid shall accompany the proposal. Question Deadline 08/12/2025 Questions shall be submitted through the online. The Department may not answer all questions, and any decision on whether a question is answered will be within the sole discretion of the Department. Any questions received less than three working days prior to the bid opening date may not be answered. Engineering Specialist: Vian Rashid Pre-Qualification: Yes AZDOT - Pedestrian Improvements - Main Street

Award

Sidewalks / Parking Lot

$1,013,685.00

Public - State/Provincial

Paving, Site Work

32

5

7

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
7
Bidding Soon
247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

October 14, 2025

Project location map

Main St, Cottonwood, AZ

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed