BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 23, 2025 at 8:00 PM

Updated October 23, 2025

Site work, paving and remodeling of a mixed-use development in Iowa City, Iowa. Working plans call for the remodel of a medical facility; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

PROJECT PUT ON HOLD. The project consists of the following multiple projects, which may be bid in multiple bid packages, all located at 200 Hawkins Drive, Iowa City, IA 52242: 1) Fountain Entrance paving rework & interior remodel; 2) Stead Family Children's Hospital new paving & drive through canopy; 3) Skywalk demolition & rerouting with an associated interior remodel; 4) JPP South Entrance paving rework & interior remodel; and 5) Early phase site demolition & grading. Statements of Qualification are being accepted for the following Scope(s) of Work: 02C - Demolition & Selective Demolition (Existing Canopy, Existing Skywalk, Precast, Storefront/Curtain Wall, Interior Structural & Architectural) - Anticipated Budget Range: $900,000 - $1,050,000 03A - Structural Concrete - Anticipated Budget Range: $550,000 - $625,000 05A - Structural Steel, Steel Decking, Metal Fabrications, Facility Fall Protection - Anticipated Budget Range: $1,600,000 - $1,900,000 06E - Carpentry / General Trade - Rough Carpentry, Roof Blocking, Salvage Items, Casework (Supply & Install), DFH (Supply & Install, Pre-Hardware), Toilet Accessories, Fire Protection Specialties, Safety Specialties, Wall Protection, Floor Mats & Frames, Safety & Maintenance, Prefabricated Valet Booth, Automatic Door Operators - Anticipated Budget Range: $250,000 - $300,000 07B - Air Barrier, Waterproofing, & Expansion Joints - Anticipated Budget Range: $75,000 - $110,000 07E - Metal Panels - Anticipated Budget Range: $1,100,000 - $1,200,000 07G - Roofing, Sheetmetal, & Roofing Specialties - Anticipated Budget Range: $325,000 - $375,000 08G - Glazing, Automatic Entrances, Storefronts, Associated Auto Operators, Curtain Wall, & Skylights - Anticipated Budget Range: $450,000 - $525,000 09A - Framing, Drywall, Top & Bottom of Wall Sound Caulking, Drywall Infection Control Partitions, Sheathing, Access Panels, Direct Applied Exterior Finish System (DEFS), Spray Applied Fireproofing, Acoustical Ceilings - Anticipated Budget Range: $800,000 - $900,000 09D - Terrazzo - Anticipated Budget Range: $125,000 - $175,000 09H - Resilient Flooring, Carpet, & Ceramic Tile - Anticipated Budget Range: $125,000 - $175,000 10G - Signage - Anticipated Budget Range: $225,000 - $300,000 21A - Fire Suppression - Anticipated Budget Range: $125,000 - $150,000 23B - Plumbing, Mechanical/HVAC, BAS Controls, Associated Demolition, Air Intake Protection & Maintenance - Anticipated Budget Range: $1,600,000 - $1,725,000 26A - Electrical, Site Electrical, Fire Alarm, Low Voltage System Rough-In, Temporary Power, & Associated Demolition - Anticipated Budget Range: $1,350,000 - $1,500,000 27A - Telecommunications & Associated Demolition - Anticipated Budget Range: $250,000 - $325,000 28A - Security - Anticipated Budget Range: $200,000 - $275,000 31F - Drilled Piers & Micro Piles - Anticipated Budget Range: $625,000 - $700,000 31G - Earthwork, All Site Demolition, Site Salvage Items, Bike Rack Relocation, Temporary Construction Gravel Laydown & Drive Lanes, Geofoam, & Topsoil - Anticipated Budget Range: $1,800,000 - $1,950,000 32G - Landscaping, Sodding, Site Landscaping Salvage & Demolition Items - Anticipated Budget Range: $275,000 - $325,000 32H - Site Concrete (Concrete Paving/Sidewalks/Site Concrete, Demo of Existing Paving & Sidewalks, Aggregate Base, Bollards, Pavement Markings) - Anticipated Budget Range: $950,000 - $1,050,000 32J - Champion Trees Relocation - Anticipated Budget Range: $600,000 - $675,000 33A - Site Utilities & Associated Demolition - Anticipated Budget Range: $450,000 - $500,000 Construction of all areas is scheduled to begin in the summer of 2025 with various substantial completion dates scheduled through the spring of 2026. Statement of Qualifications Criteria will be based on the following: o Firm's Experience as a Contractor o Capacity of Key Personnel o Technical Competence o Capability to Perform o Past Performance of the Firm o Past Performance of the Firm's Employees o Firm's Safety Record and Compliance with State and Federal Laws o Availability To and Familiarity With the Location of the Project Question Deadline 07/07/2025 at 3:00 PM CT All questions regarding the Statement of Qualifications Please submit all questions through Electronically.

Final Planning

Medical

$37,580,000.00

Public - State/Provincial

Paving, Remodeling, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
94
Bidding Soon
1,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

September 9, 2025

Project location map

200 Hawkins Dr, Iowa City, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.