Demolition, site work, renovation and addition to a museum in Linden, Michigan. Completed plans call for the addition of a 10,572-square-foot, four-story above grade museum; for the demolition of a museum; for the renovation of a museum; and for site work for a museum.

Cunningham-Limp has been selected by the City of Linden to act as their Construction Manager for the construction of an addition and renovation improvements of the Linden Mills. Reference Number 0000391318 Existing three-story building renovation and addition Bid Intent Not Available Job Location: City of Linden, Michigan The complete renovation of an existing historical Mill Building. Project will include the construction of a new addition. PROJECT DESCRIPTION: Existing three-story building renovation and addition. APPLICABLE TRADES: Building Demo; Abatement; Earthwork & Site Utilities; Ornamental Railings; Coffer Dam; Site Paving; Site Concrete; Landscape/Irrigation and all Building Related Trades. Building Trades generally include Foundations; Flatwork; Masonry; Structural and Misc. Steel; Millwork; Roofing; Waterproofing / Damproofing; Air Barrier; Joint Sealants; Fiber Cement Siding; Doors / Frames / Hardware; Window Restoration; Manufactured Windows; Glass & Glazing; Rough Carpentry; Drywall; Insulation; Hard Tile; Carpet & Resilient Flooring; Interior & Exterior Painting; Toilet Accessories; Elevator; Fire Extinguisher Specialties; Fire Protection. Work Not Included: Plumbing, HVAC, Electrical Question Deadline 07/03/2025 at 12:00 PM ET Questions are submitted online No, Via Email to Ryon Barker rmbarker@clc.build. Start of Construction: August 2025 Substantial Completion: By May 2026 Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % ALL Bids to be accompanied by a Bid Bond or Cahiers Check in the name of Cunningham-Limp in the amount of 5% of the Bid Amount Cunningham-Limp reserves the right to evaluate bids on any basis of its choosing and to waive any formalities in that regard. Additionally, Cunningham-Limp may accept or reject any or all bids and award subcontract and / or purchase orders to the most responsive and responsible bidder, as determined by Cunningham-Limp. Cost of bidding is solely the responsibility of the bidder regardless of award.

Post-Bid

Museum

$2,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

48

24

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
305
Active Projects
116
Bidding Soon
2,397
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

August 1, 2025

Project location map

201 N Main St, Linden, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.