BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work and paving for a mixed-use development in Winterset, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Construct 2025 Street Improvements including all labor, materials and equipment necessary for approximately 21,000 SY of HMA milling and overlay, 2,300 SY of 8" PCC pavement patching, 1,900 LF of PCC curb and gutter replacement, 450 SY of PCC sidewalk ramp replacement, surface restoration and miscellaneous associated work, including cleanup. Each proposal shall be made out on a blank form furnished by the municipality and must be accompanied in a sealed envelope by either (1) a certified or cashier's check drawn on a solvent Iowa bank or a bank chartered under the laws of the United States or a certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, in an amount equal to five percent (5%) of the bid, or (2) a bid bond executed by a corporation authorized to contract as a surety in the State of Iowa, in the penal sum of five percent (5%) of the bid. The successful bidder will be required to furnish a bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operations of the Contractor, and shall guarantee the work against faulty workmanship and materials for a period of four (4) years after its completion and acceptance by the City Council. The work will commence within ten (10) calendar days after the date set forth in written Notice to Proceed. If Alternate Bid 1 is selected, all street work shall be substantially completed with the site stabilized by November 22, 2025; all work on the project shall be completed by May 31, 2026, subject to any extensions of time which may be granted by the City. If Alternate Bid 2 is selected, all work on the project shall be completed by May 31, 2026, subject to any extensions of time which may be granted by the City. Damages in the amount of Five Hundred Dollars ($500.00) per consecutive calendar day will be assessed for each day that work remains uncompleted after the interim completion date and/or after the final completion date. Separate damage assessment may be made for each of the completion dates with due allowance for extensions of the contract period due to conditions beyond the control of the Contractor. The City Council reserves the right to reject any or all bids and to waive informalities or technicalities in any bid and to accept the bid which it deems to be in the best interest of the City Bid Result Construct Alternate Bid 1 - TK Concrete, Inc - $770,409 Construct Alternate Bid 2 - TK Concrete, Inc - $795,730

Award

Roads / Highways

$1,566,139.00

Public - City

Paving, Site Work

33

5

15

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
84
Bidding Soon
1,015
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 15, 2025

Project location map

Multiple Locations, Winterset, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.