Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 25, 2025 at 8:00 PM
Updated August 26, 2025
Site work and paving for a mixed-use development in Bridgewater, New Jersey. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
**As of August 25, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** https://www.bridgewaternj.gov/wp-content/uploads/2025/04/4-24-2025-Agenda.pdf PROJECT RESOLUTION FOR PROFESSIONAL SURVEYING AND ENGINEERING SERVICES (PHASE 1) FOR THE 2025-1 ROADWAY IMPROVEMENT PROJECT WHICH INCLUDES THE ENTIRE LENGTHS OF COLUMBIA DRIVE, DARTMOUTH AVENUE, STANFORD DRIVE, KELLY COURT, POPE ROAD, KIMS COURT, HOLLENDER STREET, AND HARRY ROAD AND PARTIAL LENGTHS OF MONROE STREET, JACKSON STREET, CHARLES STREET (HARRY ROAD TO POPE ROAD), THOMAS STREET (EAST MAIN STREET TO HARRY ROAD), AND SOUTHSIDE AVENUE (DUTCH LANE TO LOESER AVENUE) TO MORGAN ENGINEERING LLC, 8 CENTRAL AVENUE, BOX 220, ISLAND HEIGHTS, NJ 08732, IN THE AMOUNT OF $156,740.00, FUNDED THROUGH THE 2017, 2022, 2023 and 2024 CAPITAL ROAD IMPROVEMENT BOND -------------------------------------------------------------------------------------------------------- Project Description: Provide construction services which will consist of improvements to the entire lengths of Columbia Drive, Dartmouth Avenue, Stanford Drive, Kelly Court, Pope Road, Kim's Court, Hollender Street, and partial lengths of Jackson Street and Monroe Street, including but not limited to milling and overlay of the existing pavement with full-depth reconstruction in certain areas, storm sewer upgrades, new accessible ramps, select sidewalk replacement, areas of new sidewalks and curb replacement, and driveway repairs. The overall project length 6,800 linear feet. All disturbed areas will be restored to their original condition. The Bids for this project have been broken out into a Base and Alternate Bid. The Base Bid includes all improvements to the partial lengths of Jackson Street and Monroe Street, whereas the Alternate Bid includes improvements to the entire lengths of Columbia Drive, Dartmouth Avenue, Stanford Drive and Kelly Court. Bridgewater Township will evaluate the successful Bid and determine whether to award the construction services for both the Base and Alternate Bid or for the Base Bid alone. Bid Addenda will be issued online. Therefore, it is the sole responsibility of the bidder to check online from now through the bid opening. All bid results will be posted online. Bidders are subject to the provisions of the N.J. Local Public Contracts Law, N.J.S.A.40A:11 - 1 seq. governing bidding requirements. Bidders are required to comply with the requirement of N.J.S.A. 10:5-31 at seq and P.L. 1975 c. 127 (N.J.A.C. 17:27) AFFIRMATIVE ACTION
Bid Results
Roads / Highways
$322,383.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2025
August 15, 2025
Multiple Locations, Bridgewater, NJ
Related To This Project
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jul 22 2025
Bridgewater, NJ
Bid Date: Jul 22 2025
Bridgewater, NJ
Bid Date: Jul 22 2025
Bridgewater, NJ
Bid Date: Aug 26 2025
Bridgewater, NJ
Bid Date: Oct 01 2025
Bridgewater, NJ
Bid Date: Jul 16 2025
Bridgewater, NJ
Bid Date: Jun 25 2025
Bridgewater, NJ
Bid Date: May 29 2025
Bridgewater, NJ
Bid Date: Jun 12 2025
Bridgewater, NJ
Bid Date: Jun 05 2025
Bridgewater, NJ
Bid Date: May 01 2025
Bridgewater, NJ
Bid Date: May 09 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
