BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a mixed-use development in Inver Grove Heights, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Said proposals for the furnishing of all labor and materials for the construction, complete in-place, of the following approximate quantities: Remove Bituminous Pavement 2879 SY Const Drainage Structure Des 48-4020 61 LF Remove Bituminous Walk 3153 SF 6" Concrete Walk 1186 SF Aggregate Base, Class 5 2585 TON Concrete Curb & Gutter Design B618 2650 LF Type SP 9.5 Wearing Course Mix (3,B) 792 TON Seeding 2.63 AC Type SP 12.5 Wearing Course Mix (4,C) 709 The bid bonds must be payable to the City of Inver Grove Heights in the amount of five percent (5%) of the amount of bid, to be forfeited as liquidated damages if the bid is accepted, and the bidder shall fail to promptly enter a written contract and furnish the required bond. Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations All questions regarding the Plans and Contract Documents are to be submitted to the Engineer in writing. PROJECT NO. CPR 1925 (134) PN-INVER176187

Award

Roads / Highways

$971,495.00

Public - City

Paving, Site Work

80

14

4

6

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
124
Bidding Soon
1,525
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 18, 2025

Project location map

Babcock Trail, Inver Grove Heights, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.