Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2025 at 8:00 PM
Updated August 5, 2025
Site work, paving and outdoor lighting for a mixed-use development in Palm Beach Gardens, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
Federal Aid No D425010B The Improvements under this Contract consist of, but are not limited to, MOT (standard, pedestrian/bicycle detour, low-profile barrier, signalization and maintenance, traffic detection and maintenance, arrow board, PCMS), environmental (sediment barrier, inlet protection), monitor existing structures (inspection, settlement, vibration), concrete (remove, curb and gutter, curb, traffic separator, sidewalk, driveways), asphalt (milling, resurfacing), pavement markings (detectable, RPM, painted, thermoplastic, bike lane, patterned), signing (single-column, multi-column, panel remove, tubular marker, object marker, reflective sign strip), signalization (aluminum pole, pedestrian signal, loop detector, loop assembly, vehicle detection, pedestrian detection), traffic monitoring site, conduit, pull/splice box, utilities adjustments (manhole, valve box), and sod along State Road 811 (Alt. A1A) from south of RCA Boulevard to north of Donald Ross Road for 3.31 miles in the City of Palm Beach Gardens, the Town of Jupiter, and unincorporated areas of, Palm Beach County. Counties: Palm Beach Call Order: 012 Road Name: SR 811 (ALT A1A) Limits: From S of Rca Blvd to N of Donald Ross Rd Project(s): 44843515201(*) Federal Aid No: D425010B Project(s): 44843515202 Federal Aid No: N/A Project(s): 44843515203 Federal Aid No: N/A Total Roadway Length: 3.310 Miles Total Bridge Length: 0.000 Miles Total Proposal Length: 3.310 Miles Contract Days: 209 Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 60 Days Please read the full advertisement Description: The Improvements under this Contract consist of, but are not limited to, MOT (standard, pedestrian/bicycle detour, low-profile barrier, signalization and maintenance, traffic detection and maintenance, arrow board, PCMS), environmental (sediment barrier, inlet protection), monitor existing structures (inspection, settlement, vibration), concrete (remove, curb and gutter, curb, traffic separator, sidewalk, driveways), asphalt (milling, resurfacing), pavement markings (detectable, RPM, painted, thermoplastic, bike lane, patterned), signing (single-column, multi-column, panel remove, tubular marker, object marker, reflective sign strip), signalization (aluminum pole, pedestrian signal, loop detector, loop assembly, vehicle detection, pedestrian detection), traffic monitoring site, conduit, pull/splice box, utilities adjustments (manhole, valve box), and sod along State Road 811 (Alt. A1A) from south of RCA Boulevard to north of Donald Ross Road for 3.31 miles in the City of Palm Beach Gardens, the Town of Jupiter, and unincorporated areas of, Palm Beach County. Question Deadline 07/23/2025 at 5:00 PM ET, Questions posted to this site will be responded to by the Department. For questions posted after this time, an answer cannot be assured. For all questions posted before the deadline, FDOT will provide and post responses on online. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 012 - Resurfacing - SR 811 (ALT A1A)
Bid Results
Roads / Highways
$5,935,381.00
Public - State/Provincial
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
7
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
September 29, 2025
FL-811, Palm Beach Gardens, FL
Related To This Project
Palm Beach Gardens, FL
Bid Date: Nov 19 2025
Palm Beach Gardens, FL
Bid Date: Sep 04 2025
Palm Beach Gardens, FL
Bid Date: Oct 28 2025
Palm Beach Gardens, FL
Bid Date: Aug 29 2025
Palm Beach Gardens, FL
Bid Date: Oct 02 2025
Palm Beach Gardens, FL
Bid Date: Nov 14 2025
Palm Beach Gardens, FL
Bid Date: Oct 30 2025
Palm Beach Gardens, FL
--
Palm Beach Gardens, FL
--
Palm Beach Gardens, FL
Bid Date: Jun 11 2025
Palm Beach Gardens, FL
Bid Date: Jul 07 2025
Palm Beach Gardens, FL
Bid Date: May 28 2025
Palm Beach Gardens, FL
--
Palm Beach Gardens, FL
Bid Date: May 28 2025
Palm Beach Gardens, FL
Bid Date: Jun 05 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
