Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 31, 2025 at 8:00 PM
Updated August 1, 2025
Site work and paving for a sidewalk / parking lot in Largo, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Project consists of SW Rec Parking Lots Pavement and ADA Improvements. Work includes curbing, sidewalk, ADA parking stalls and aisles, crosswalks, speed bump installation, and mill and overlay of asphalt. Please see the Bid Form in the Bid Package for Base Bid and Alternate Bid. All communications pertaining to this contract shall carry the reference "City Bid No. 25-B-842". Question Deadline 07/10/2025 Direct questions concerning this Bid to Kezia Southern, Procurement Analyst, ksouthern@largo.com. No Pre-bid conference will be held at this time. Bid security shall be furnished in accordance with the Instructions to Bidders. A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents). The work covered by these specifications comprises, in general, the furnishing of all labor, equipment and materials. The work shall include the performing of all operations to construct road improvements, as well as water, sewer, and drainage improvements for the City of Largo as described and specified further in the Technical Specifications, and as shown on the Contract Drawings. B. Except as specifically noted, the Contractor shall provide and pay for: 1. Labor, materials, tools, construction equipment, and machinery. 2. Water and utilities required for construction. 3. Other facilities and services necessary for proper execution and completion of the work. 4. Testing lab services. A. The Contractor shall comply with all codes, ordinances, rules, regulations, orders and other legal requirements of the City of Largo. B. Roadway restoration/reconstruction for any individual street shall be completed within 30 calendar days subsequent to substantial completion of underground utility construction on a street by street basis. The submitted construction schedule shall indicate this construction sequence.
Bid Results
Sidewalks / Parking Lot
$301,858.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 30, 2025
August 29, 2025
13120 Vonn Rd, Largo, FL
Related To This Project
Largo, FL
Bid Date: Aug 06 2025
Largo, FL
Bid Date: Jul 24 2025
Largo, FL
Bid Date: Aug 25 2025
Largo, FL
Bid Date: Aug 25 2025
Largo, FL
Bid Date: Jul 14 2021
Largo, FL
--
Largo, FL
Bid Date: Jul 22 2025
Largo, FL
Bid Date: Jul 03 2025
Largo, FL
Bid Date: Jul 17 2025
Largo, FL
Bid Date: Aug 07 2020
Largo, FL
Bid Date: Jul 18 2025
Largo, FL
Bid Date: Jul 08 2025
Largo, FL
Bid Date: Jun 24 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
