BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 31, 2025 at 8:00 PM

Updated August 1, 2025

Site work and paving for a sidewalk / parking lot in Largo, Florida. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Project consists of SW Rec Parking Lots Pavement and ADA Improvements. Work includes curbing, sidewalk, ADA parking stalls and aisles, crosswalks, speed bump installation, and mill and overlay of asphalt. Please see the Bid Form in the Bid Package for Base Bid and Alternate Bid. All communications pertaining to this contract shall carry the reference "City Bid No. 25-B-842". Question Deadline 07/10/2025 Direct questions concerning this Bid to Kezia Southern, Procurement Analyst, ksouthern@largo.com. No Pre-bid conference will be held at this time. Bid security shall be furnished in accordance with the Instructions to Bidders. A Bid must be accompanied by Bid security made payable to Owner in an amount of five percent (5%) of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents). The work covered by these specifications comprises, in general, the furnishing of all labor, equipment and materials. The work shall include the performing of all operations to construct road improvements, as well as water, sewer, and drainage improvements for the City of Largo as described and specified further in the Technical Specifications, and as shown on the Contract Drawings. B. Except as specifically noted, the Contractor shall provide and pay for: 1. Labor, materials, tools, construction equipment, and machinery. 2. Water and utilities required for construction. 3. Other facilities and services necessary for proper execution and completion of the work. 4. Testing lab services. A. The Contractor shall comply with all codes, ordinances, rules, regulations, orders and other legal requirements of the City of Largo. B. Roadway restoration/reconstruction for any individual street shall be completed within 30 calendar days subsequent to substantial completion of underground utility construction on a street by street basis. The submitted construction schedule shall indicate this construction sequence.

Bid Results

Sidewalks / Parking Lot

$301,858.00

Public - City

Paving, Site Work

8

12

2

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
98
Bidding Soon
1,764
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

August 29, 2025

Project location map

13120 Vonn Rd, Largo, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.