Demolition, site work, paving and new construction of a civil project in Hendersonville, North Carolina. Completed plans call for site work for a road / highway; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; bridge / tunnel; for paving for a bridge / tunnel; road / highway; and water / sewer project.
TIP Number: N/A Federal Aid Number: Helene WBS Number: DF18314.2045339 County: Henderson Bridge Replacement: Grading, Drainage, Structure and Paving at Bridge No. 440036 On SR 1586 (South Mills Gap Road) Over Clear Creek in Henderson County Project Length: 0.149 Miles Project specific questions should be directed to the Division 14 Contract Office at d14contracts@ncdot.gov. There is NO pre bid meeting associated with this proposal. Questions should be directed to Jaci Kincaid at 919-707-6920. For questions or problems becoming an NCDOT vendor, to get pre-qualified, or to update your work codes NCDOT - Bridge Replacement: Grading, Drainage, Structure and Paving at Bridge No. 440036 on SR 1586 (South Mills Gap Road) Bridge approach fills consist of backfilling behind bridge end bents with select material or aggregate to support all or part of bridge approach slabs. Install outlets and grade bridge approach fills to drain water through and away from approach fills. Install geotextiles to allow for possible future slab jacking and separate approach fills from embankment fills, natural ground and pavement sections as required. For bridge approach fills behind end bents with mechanically stabilized earth (MSE) abutment walls, reinforce bridge approach fills with MSE wall reinforcement connected to end bent caps as required. Construct bridge approach fills in accordance with the contract, accepted submittals and bridge approach fill Roadway Standard Drawings. The North Carolina Department of Transportation will administer a custom version of the Federal On-the-Job Training (OJT) Program, commonly referred to as the Alternate OJT Program. All contractors (existing and newcomers) will be automatically placed in the Alternate Program. Standard OJT requirements typically associated with individual projects will no longer be applied at the project level. Instead, these requirements will be applicable on an annual basis for each contractor administered by the OJT Program Manager. On the Job Training shall meet the requirements of 23 CFR 230.107 (b), 23 USC - Section 140, this provision and the On-the-Job Training Program Manual. The Alternate OJT Program will allow a contractor to train employees on Federal, State and privately funded projects located in North Carolina. However, priority shall be given to training employees on NCDOT Federal-Aid funded projects. Concrete washouts are impermeable enclosures, above or below grade, to contain concrete wastewater and associated concrete mix from cleaning of ready-mix trucks, drums, pumps, tools or other equipment. Concrete washouts must collect and retain all the concrete washout water and solids, so that this material does not migrate to surface waters or into the ground water. These enclosures are not intended for concrete waste not associated with washout operations. Acceptable concrete washouts may include constructed earthen structures, above or below ground, or commercially available devices designed specifically to capture concrete wash water. This project is located in an Environmentally Sensitive Area. This designation requires special procedures to be used for clearing and grubbing, temporary stream crossings, and grading operations within the Environmentally Sensitive Areas identified on the plans and as designated by the Engineer. This also requires special procedures to be used for seeding and mulching and staged seeding within the project. The Environmentally Sensitive Area shall be defined as a 50-foot buffer zone on both sides of the stream or depression measured from top of streambank or center of depression. This work consists of furnishing, installing, maintaining, pumping and removing an Impervious Dike for the purpose of diverting normal stream flow around the construction site. The Contractor shall construct an impervious dike in such a manner approved by the Engineer. The impervious dike shall not permit seepage of water into the construction site or contribute to siltation of the stream. The impervious dike shall be constructed of an acceptable material in the locations noted on the plans or as directed by the Engineer. This work consists of furnishing and placing permanent soil reinforcement mat (PSRM), of the type specified, over previously prepared areas at locations shown on the plans and as directed by the Engineer. Safety Fence shall consist of furnishing materials, installing and maintaining polyethylene or polypropylene fence along the outside riparian buffer, wetland, or water boundary, or other boundaries located within the construction corridor to mark the areas that have been approved to infringe within the buffer, wetland, endangered vegetation, culturally sensitive areas or water. The fence shall be installed prior to any land disturbing activities. Interior boundaries for jurisdictional areas noted above shall be delineated by stakes and highly visible flagging. Jurisdictional boundaries at staging areas, waste sites, or borrow pits, whether considered outside or interior boundaries shall be delineated by stakes and highly visible flagging.
Bid Results
Bridges / Tunnels
$1,187,917.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
September 22, 2025
S Mills Gap Rd, Hendersonville, NC
Related To This Project
Hendersonville, NC
Bid Date: Jul 22 2025
Hendersonville, NC
Bid Date: Jul 22 2025
Hendersonville, NC
Bid Date: Jul 17 2025
Hendersonville, NC
Bid Date: Jul 25 2025
Hendersonville, NC
Bid Date: Jul 22 2025
Hendersonville, NC
Bid Date: Aug 19 2025
Hendersonville, NC
Bid Date: Sep 25 2025
Hendersonville, NC
Bid Date: Sep 12 2025
Hendersonville, NC
Bid Date: Jul 22 2025
Hendersonville, NC
Bid Date: Jul 10 2025
Hendersonville, NC
Bid Date: Jul 08 2025
Hendersonville, NC
Bid Date: Jun 26 2025
Hendersonville, NC
Bid Date: Jun 18 2025
Hendersonville, NC
Bid Date: Jul 10 2025
Hendersonville, NC
Bid Date: Jun 16 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.