BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2025 at 8:00 PM

Updated August 5, 2025

Site work for a water / sewer project in Midvale, Utah. Completed plans call for site work for a water / sewer project.

The project includes: lining of approximately 7,139 linear feet of 8-inch diameter pipe and 92 linear feet of 10-inch diameter pipe, remotely reinstating approximately 122 service laterals, and rehabilitation of approximately 58 manholes. The work is located within the boundary of MSD (located in Midvale City.) The work shall include, but not be limited to, the supply and installation of associated material for the continuous rehabilitation of gravity mainline pipe by the Ultra-Violet (UV) Light Glass Reinforced Cured-in-Place Pipe (CIPP) process. The work shall also include, but not be limited to, the supply and installation of associated material for the rehabilitation of manholes using 100% Solids Epoxy. The manholes are located within the alignment(s) of the CIPP project. The successful contractor shall provide traffic control and bypass pumping as required for the project. Site Directions: Various locations throughout Midvalley Sewer District area. Est. Completion Date: Oct. 31, 2025 Pre-Bid Meeting Info: No Prebid Meeting A Bid Bond in the amount of 5% must accompany each Bid. MSD reserves the right to reject any and all bids, or items within a bid, at its sole discretion. Only bids giving a firm quotation, properly signed, will be accepted. All bids are subject to applicable Utah laws and regulations. The Owner will not award the Contract to a Bidder who is not properly licensed in Utah or if the Contract would exceed the limit of the Bidder's license at the time of award. For questions, please contact Dan Woodbury, P.E. of AQUA Engineering at (801) 299-1327. A pre-Bid conference will not be held. Question Deadline 07/09/2025 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

Award

Water / Sewer

$860,115.00

Public - City

Site Work

6

17

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
77
Bidding Soon
1,007
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2025

August 1, 2025

Project location map

Multiple Locations, Midvale, UT

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.