Published August 5, 2025 at 8:00 PM

Updated August 6, 2025

Site work and paving for a mixed-use development in Layton, Utah. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of August 5 , 2025 this project cancelled and no plan to rebid..** The District will be receiving bids for the Weber Basin Waterline Replacement at 1150 W (SR-168), Ritter Drive, South Weber Drive (SR-60), 1050 West (SR-60) The work generally includes the installation of a 30 inch and 10 inch waterline removal and replacement of road and sidewalk surfaces that are impacted by this project. Questions concerning the project can be directed to Matt Meier via email to: mmeier@weberbasin.gov The work includes furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above projects; consisting of the following items of work: mobilization; obtaining all bonds and insurance (including UDOT permits), removal of curb & gutter; removal of sidewalk; removal of asphalt and roadbase; removal and replacement of storm water pipe and appurtenance as required; furnish and install pvc culinary waterline 30-inch and 10-inch with appropriate fittings; installation of asphalt and roadbase surfacing; installation of sidewalk; installation of curb and gutter; and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC. The Engineer's Estimate of Cost for the total project is $525,000. PROJECT LOCATION: 1150 West, Ritter Drive, South Weber Drive, 1050 West in Riverdale City, Utah Question Deadline 07/11/2025 Questions concerning the project can be directed to Matt Meier via email to: mmeier@weberbasin.gov. No drawing, specifications, product substitution and/or interpretations will be made unless noted with"Addendum". The bidder, if in doubt as to the meaning of any part of the contract documents, or should they find any discrepancies therein, must submit to the engineer a written request for interpretation. The submittal for clarification must be submitted no later than six (6) days prior to the bid date or the date scheduled for opening of the bids.

Final Planning

Water / Sewer

$525,000.00

Public - State/Provincial

Paving, Site Work

17

10

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
54
Bidding Soon
1,033
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.