BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2025 at 8:00 PM

Updated August 24, 2025

Site work and paving for a mixed-use development in Boynton Beach, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Deadline for Questions Date: Monday, July 21, 2025, at 2:30 PM The City of Boynton Beach "City" Utilities Department is requesting sealed bids from qualified firms for water and sewer system replacement, drainage improvements, including the creation of a new 24-inch outfall, lift station rehabilitation, and associated restoration work, including driveways, swales, and roadway surfaces. This project is being funded, in whole or in part, by the Florida Department of Environmental Protection (FDEP) through the Resilient Florida Grant Program. The Contractor shall furnish all labor, tools, equipment, materials, supplies, manufactured articles, furnishing all transportation and services, and essential communications, etc., as necessary to complete the project, as indicated in the Special Conditions, Special Provisions, Project Design Plans, Technical Specifications and ITB No. 25-071B Documents herein, along with all engineering, shop drawings, and other documentation necessary to obtain all applicable permits and all bonds, securities, licenses and insurance to complete the project as specified herein and within the Project Design Plans. All proposed improvements shall be completed in accordance with the project bid documents, design plans, details, technical specifications/scope of work, and all applicable federal, state, county, and local regulatory requirements. ALL PROSPECTIVE BIDDERS/RESPONDENTS ARE HEREBY CAUTIONED NOT TO CONTACT ANY MEMBER OF THE CITY OF BOYNTON BEACH STAFF OR OFFICIALS OTHER THAN THE SPECIFIED CONTACT PERSON. Question Deadline 07/21/2025 at 2:30 PM ET Right is reserved to reject any or all bids/proposals and to waive technical errors, or to accept any bids/proposals that are in part deemed as the most responsive, responsible bidder/offeror which represents the most advantageous bid to the City. In determining the "most advantageous bid", price, quantifiable factors, and other factors are considered. This would include specifications, delivery requirements, the initial purchase price, life expectancy, cost of maintenance and operation, operating efficiency, training requirements, disposal value and other factors contributing to the overall acquisition cost of an item. Consideration may be given, but not necessarily limited to conformity to the specifications, including timely delivery, product warranty, a bidder's/offeror's proposed service, ability to supply and provide service, delivery to required schedules and past performances in other contracts with the City or other government entities.

Bid Results

Water / Sewer

$5,244,391.00

Public - City

Paving, Site Work

69

13

74

9

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
110
Bidding Soon
1,854
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 29, 2025

Project location map

Coquina Rd, Boynton Beach, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.