BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work and renovation of a civil project in Moore Haven, Florida. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

**As of February 22, 2022, the project is on hold. No definite date for the rebid.** The project consists of the rehabilitation of the existing ballpark lift station, including new duplex submersible pumps, wet well and valve vault pipes and fittings, and new electrical controls including level controls. The Contractor shall be responsible for providing all materials, equipment and labor as necessary to complete the project per the plans and specifications. All Technical Questions Shall Be in Writing at Least 5 Workdays Prior to the Bid Opening and Should Be Directed to Greg Giarratana at Gregg@craigasmith.com. Question Deadline 07/11/2025. Bidders Shall Confine Their Bids to the Project in Its Entirety. Partial Bids Will Not Be Considered. Each Bidder Shall Submit With This Bid Evidence That He is Licensed to Perform the Work and Services or Qualified by Examination to Be So Licensed. Each Bid Shall Be Accompanied by a Certified Check or by an Acceptable Bid Bond in an Amount Equal to at Least Five (5) Percent of the Amount of the Bid Payable to Glades County, as a Guarantee That if the Bid is Accepted the Bidder Will Execute the Contract and File Acceptable Performance and Payment Surety Bonds Equal to One Hundred Percent (100%) of the Contract Price Within Ten (10) Days After Written Notice of the Award of Contract. No Bidder May Withdraw His Bid for a Period of Ninety (90) Days After Date Set for Opening of the Bids. City County Public Works Authority Reserves the Right to: Waive Informalities in Any Bid, Delete Any Portion of the Project; Extend the Project Within the Limits of the Work Involved. The Owner Has the Right to Accept or Reject Any or All Bids. The BIDS shall be based on providing all materials, equipment and labor for the CCPWA BALL PARK LIFT STATION REHABILITATION PROJECT. The project consists of the rehabilitation of the existing ballpark lift station, including new duplex submersible pumps, wet well and valve vault pipes and fittings, and new electrical controls including level controls. The Contractor shall be responsible for providing all materials, equipment and labor as necessary to complete the project per the plans and specifications. Site visit is mandatory prior to submittal of a proposal to verify the existing conditions and evaluate the suitability for rehabilitation of the existing ball park lift station improvements.

Final Planning

Water / Sewer

$500,000.00

Public - City

Renovation, Site Work

10

14

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
3
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

February 27, 2026

Project location map

To Be Determined, Moore Haven, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.