BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work and paving for a road / highway in Charlotte, North Carolina. Design plans call for site work for a road / highway; and for paving for a road / highway.

Pedestrian improvements includes approximately 2.1 miles of sharrows, modernization of two existing rectangular rapid flashing beacons, replacement of 14 wheelchair ramps, a new pedestrian crossing at Pecan Avenue and Shenandoah Avenue, implementation of new bike detection cameras, a new full traffic signal at Bascom Street and 7th Street. Phase 2 will include the full traffic signal located at the intersection of 7th Street and Cameron Avenue. As of July 2, 2025, this project is in the design phase. Design is being completed in-house. Construction will begin in the Summer of 2026.

Design

Roads / Highways

$1,500,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
222
Active Projects
136
Bidding Soon
1,644
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2026

Project location map

W 7th St, Charlotte, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.