BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Site work for a civil project in Fulshear, Texas. Completed plans call for site work for a water / sewer project.

Work is described in general, non-inclusive terms as: DR Horton has begun developing an area on the north side of Fulshear Texas in a community called Tamarron West. Water for this community will be supplied by a southern water plant with water from the City of Fulshear and a northern water plant fed by groundwater. The southern water plant and northern water plant have already been constructed. This project specifically includes construction of two additional off-site groundwater wells with a target combined capacity of 1,000 gpm which are needed to meet the water demand for the community. Additional items for the well include site grading, electrical connection, and a generator. Please direct all questions related to the design of this Project to the Q&A Section The deadline to ask questions is 8/15/2025 12:00 PM EST Please direct all questions related to the design of this Project to the Q&A Section. A tour of the Site will be held the afternoon of the pre-bid conference. Prospective Offerors attending this site tour are required to arrange their own transportation to the Site. Maps to the Site will be available at the pre-bid conference. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$5,600,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
421
Active Projects
229
Bidding Soon
3,332
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 19, 2025

October 17, 2025

Project location map

3150 1/2 Raymond Franz Pkwy, Fulshear, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.