BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 18, 2025 at 8:00 PM

Updated February 4, 2026

Site work and paving for a mixed-use development in Palm Desert, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Scope of Services 1. Furnish all labor, materials, and equipment necessary to abandon existing 8-inch, 12-inch, and 18-inch ductile-iron pipe in place by means of pressure grouting and remove and dispose of pipe and associated appurtenances as required. 2. Removal of existing valve collars and cans, abandonment of existing valves in place, and proper disposal of fire hydrants. 3. Furnish all labor, materials, and equipment necessary to all tie-in connections completed by CVWD forces at several locations to existing water mains. 4. Furnish all labor, materials, and equipment necessary to perform and install street pavement and surface restoration as shown on the Drawings. 5. Apply and Obtain Encroachment Permit from the City of Indio, including the preparation and implementation of Traffic Control Plans to be approved. 6. Prior to commencing work, Contractor shall notify Underground Service Alert (U.S.A., 811) of the proposed excavation. Contractor shall provide video documentation to CVWD of all existing condition, after marking utilities, for all the pre- and post-construction activities. 7. Work shall also include protecting in place or removing and replacing all existing utilities and public and private improvements in all project areas damaged during construction, including, but not limited to, curbs, gutters, concrete pavement, asphalt concrete pavement, walkways, sidewalks, cross gutters, spandrels, medians, driveways, slopes, mailboxes, landscaping, irrigation facilities, traffic striping, signs, fences andwalls. 8. Contractor shall limit the amount of disturbance to the existing landscaping/hardscaping around the existing public and private facilities during installation of new services and construction of appurtenances from the water main. Contractor shall minimize disturbance to sidewalks or mailboxes during installation of new service laterals and appurtenances from the newly installed water line to the existing meter or back of curb. 9. Contractor will be required to utilize the services of a professionally licensed landscape contractor to repair landscaping in and around areas of disturbance to existing landscape. Liquidated Damages Reverse Liquidated Damages $5,200 and Liquidated Damages $1,700 Start/Delivery Date September 24, 2025 Project Duration 225 Calendar Days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% 07/25/2025 5:00 PM (PDT) Please submit all questions and comments through online

Bid Results

Water / Sewer

$5,118,126.00

Public - City

Paving, Site Work

25

21

5

8

Subscribe For Documents

116 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
308
Active Projects
134
Bidding Soon
1,440
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

October 13, 2025

Project location map

Multiple Locations, Palm Desert, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.