BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Renovation of a municipal facility in Toronto, Ontario. Completed plans call for the renovation of a municipal facility.

CreateTO is is requesting a quote for qualified electrical contractor for 560 Commissioners Street. The successful contractor will provide all labour, equipment, and materials necessary to complete the electrical servicing. The scope of work will include: Supply and installation of a new 200A, 120/208V, 3-phase, 4-wire overhead hydro service, including: 1. Wood utility pole, 2. Weatherproof fused disconnect switch, 3. Hydro meter socket, 4. Outdoor-rated Panel RP-A Installation of site lighting infrastructure, including: 1. 20 ft and 30 ft pole-mounted LED fixtures (as per Drawing E-1.0), 2. Concrete pole bases, 3. Underground conduit and wiring, 4. Fixtures equipped with photocells and occupancy sensors Installation of site power outlets, including: 1. Outdoor-rated pedestals with NEMA 14-50R RV charger outlets, 2. 120V GFI weatherproof duplex outlets, 3. All associated underground conduit connections to Panel RP-A Provision of a 30 kVA, 208V-575V step-up transformer (NEMA 4, outdoor-rated), with underground distribution to support: 1. Site lighting, 2. RV and GFI outlets, 3. Electric gate systems Coordination of: 1. Utility locates; 2. Excavation, trenching, backfill, and compaction (via sub-trades); 3. Toronto Hydro connection; 4. Re-commissioning of two existing electric gates with Superior Door & Gate Systems Inc., including new feeders and disconnects All work must comply with ESA and OESC standards. A final ESA certificate is required upon completion. The Contractor shall obtain and pay for all permits, fees, licenses, and temporary encroachments, and shall give all required notices and comply with all applicable laws, ordinances, rules, and regulations bearing on the execution of the work. The Contractor shall provide all temporary power necessary to complete the scope of work. Markup & Overhead for Extra Work or Deletions A 10% combined overhead and profit markup shall apply to self-performed work. The cost of sub-trade work shall be subject to 5% overhead and profit, plus an additional 5% markup. Question Deadline 2025/07/18 12:00:00 PM EDT Questions are submitted online-- No Official bid documents must be obtained from www.merx.com

Post-Bid

Municipal

$40,000.00

Public - City

Renovation

4

7

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
239
Bidding Soon
4,810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2025

August 27, 2025

Project location map

560 Commissioners St, Toronto, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.