BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 5, 2025 at 8:00 PM

Updated August 8, 2025

Renovation of a clubhouse / community center in Cottondale, Florida. Completed plans call for the renovation of a clubhouse / community center.

Work on the project consist of, in general, the renovation of the existing Community Center of bathrooms, windows, doors, painting, metal roof installation, interior and exterior mechanical equipment, site work, parking and all appurtenances necessary to complete the work. The Owner requires the project to be completed within one hundred and eighty (180) consecutive calendar days. All bidders shall submit, upon request, a list of projects successfully completed in the last 3 years, having at a minimum the same scope of work and approximate construction cost as specified in this project. All bidders must comply with requirements of the Contractors Licensing Law of the State of Florida and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Information for Bidders. The successful bidder will be required to submit 100% performance and payment bonds. All contractors preparing bids shall submit with the bid documents evidence of a current Florida General Contractors, evidence (with original seal of the State of Florida) of proper registration with the Florida Secretary of State as a foreign corporation, and a Certificate of Good Standing as a Foreign Corporation from the State of Florida Department of Revenue. Additionally, all contractors preparing bids shall submit, with the bid documents, evidence of the proper licensure of all subcontractors. Subcontractor licensure shall be in accordance with the subcontractors designated scope of work. Bids submitted by any contractor without these documents included will be rejected. The Owner reserves the right to reject any or all bids and to waive any informalities, or to reject any or all bids, and to award the contract to the lowest, responsible, responsive bidder. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: Submit via email to Nolan Baker, P.E., Baker Engineer LLC., nolan@bakerengineersllc.com, Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Clubhouse / Community Centers

$850,000.00

Public - City

Renovation

54

25

4

4

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
50
Bidding Soon
797
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2025

September 8, 2025

Project location map

2659 Front Street, Cottondale, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.