Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and paving for a sidewalk / parking lot in Ringgold, Georgia. Completed plans call for paving for a sidewalk / parking lot; and for site work for a sidewalk / parking lot.

Paving, Leveling, and Sidewalk Installation - Ringgold North Street Paving is to start at Cleveland and end at High Street. North Street is .28 LM and 18 feet wide. Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 96Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----------------------------------- 96Tons *Bitum tack coat---- 201 Gallons *Milling required at all intersection transitions *No Striping Paul Croft Way (Short Street) Paving is to start at Sparks Street and end at Guyler Street. Paul Croft Way is .30 LM and 28 feet wide. Traffic control will be needed. *Spot Leveling *Recycled Asphalt Conc. Leveling include Bitum Matl and H Lime 1 inch thick---- 24 Tons *Recycled Asphalt Conc. 9.5MM Superwave, type 1 Blend include Bitum and H Lime 1 inch thick----24 Tons *Bitum tack coat---- 40 Gallons Milling required at intersection transitions *No Striping Sparks Street Sidewalk Sidewalk is to start at Whitten Street and continue to Cleveland Street at Lafayette Street. Sidewalk to be 5 feet wide and 4 inch in depth Radius form is required at each intersection and connection to existing sidewalk Sidewalk is to be flush with existing ground 4 inches of #89 base stone is required Broom finish is required Backfill and in finish seeding is required Traffic control will be needed. *Estimated concrete required (580 linear feet) --- 38 cu yd *No crosswalk Striping Boynton Drive Sidewalk Sidewalk is to start at existing termination of sidewalk and continue to Hummingbird Lane. Sidewalk to be 5 feet wide and 4 inch in depth Radius form is required at each intersection Sidewalk is to be flush with existing ground 4 inches of #89 base stone is required Broom finish is required Backfill and in finish seeding is required *Estimated concrete required (190 linear feet) ----- 14 cu yd *No crosswalk Striping

Bid Results

Sidewalks / Parking Lot

$119,953.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
235
Active Projects
136
Bidding Soon
1,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 4, 2025

Project location map

Multiple Locations, Ringgold, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.