Published September 18, 2025 at 8:00 PM
Updated September 19, 2025
Site work and paving for a road / highway in Downers Grove, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Annual maintenance of HMA pavement - The milling and patching of approximately 2,300 square yards of pavement (1 1/2", 3", removal and replacement) and all related work. Bid Bond 5% Performance Bond or Letter of Credit: YES Alterations, Cancellations, Extensions, Deductions, and Extra Work. The Department reserves the right to make, in writing, at any time during work, changes in quantities, alterations in work, and the performance of extra work to satisfactorily complete the project. Such changes in quantities, alterations, and extra work shall not invalidate the contract nor release the surety, and the Contractor agrees to perform the work as altered. If the alterations or changes in quantities significantly change the character of the work under the contract, whether or not changed by any such different quantities or alterations, an adjustment, excluding loss of anticipated profits, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the Contractor in such amount as the Engineer may determine to be fair and equitable. If alterations or changes in quantities do not significantly change the character of the work to be performed under contract, the altered work will be paid for as provided elsewhere in the contract. The term "significant change" shall be construed to apply only when the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction All alterations, cancellations, extensions, and deductions shall be authorized in writing by the Engineer before work is started. Such authorizations shall set up the items of work involved and the method of payment for each item. The Contractor shall accept payment for alterations which result in an increase or decrease in the quantities of work to be performed according to the following. (a) All increases in work of the type which appear in the contract as pay items accompanied by unit prices will, except as provided under paragraph (d) herein, be paid for at the contract unit prices. Decreases in quantities included in the contract will be deducted from the contract at the unit bid prices. No allowance will be made for delays or anticipated profits. (b) Major items of work for which the quantities are increased (c) Extra work which is not included in the contract as pay items at unit prices and is not included in other items of the contract will be paid for according to Article 109.04. (d) Extra work for which there is a pay item at unit price in the contract which for any one or more of the following reasons materially increases or decreases the cost of the pay item as bid and which is not included in the prices bid for other items in the contract will be paid for according to Article 109.04. This includes: (1) Work involving a substantial change of location. (2) Work which differs in design. (3) Work requiring a change in the type of construction. (e) In cases where the Department cancels or alters any portion of the contract items, items which are partially completed will be paid for as specified in Article 109.06. Claims for extra work which have not been authorized in writing by the Engineer will be rejected. Pre-Bid Conference Date/Time: N/A F. Pre-Bid Conference Location: N/A Bid Deposit: 5% Letter of Capability of Acquiring Performance Bond: YES Required of Awarded Contractor(s) Performance Bond or Letter of Credit: YES Certificate of Insurance: YES
Award
Roads / Highways
$67,465.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2025
September 15, 2025
Multiple Locations, Downers Grove, IL
Related To This Project
Downers Grove, IL
Bid Date: Jul 16 2025
Downers Grove, IL
Bid Date: Aug 22 2025
Downers Grove, IL
Bid Date: Jul 28 2025
Downers Grove, IL
Bid Date: Aug 01 2025
Downers Grove, IL
Bid Date: Aug 20 2025
Downers Grove, IL
Bid Date: Sep 26 2025
Downers Grove, IL
Bid Date: Aug 28 2025
Downers Grove, IL
--
Downers Grove, IL
Bid Date: Jul 16 2025
Downers Grove, IL
Bid Date: Aug 21 2020
Downers Grove, IL
Bid Date: Jul 09 2025
Downers Grove, IL
Bid Date: Aug 05 2025
Downers Grove, IL
Bid Date: Dec 12 2025
Downers Grove, IL
Bid Date: Jul 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.