Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 20, 2025 at 7:00 PM
Updated November 21, 2025
Site work and new construction of a recreation facility in Columbus, Ohio. Completed plans call for the construction of a recreation facility; and for site work for a recreation facility.
For information regarding the project, the primary contact person is the Project Engineer, Brian Jacoby, at the Columbus District Office1-614-965-0451. Or in their absence you may contact the Project Officer, Sarah Maj,at the McArthur District Office 1-740-274-4943. The Rehoboth Flumes Project is located in Clayton and Pike Townships, Perry County, Ohio. The Contact Melissa Price at 614-265-6369 with any questions regarding bidding. project is divided into two sites; one to the north where two channels meet to form the Rehoboth Tributary and one to the south near the mouth of the Rehoboth Tributary into Rush Creek. Directions to the north site are as follows: From New Lexington travel north on OH-345 for about 1.3 miles, then turn right onto County Road 112/Monsanto Road. The project site is adjacent to the south side of County Road 112, about 500 ft from the intersection with OH-345. The north site's latitude and longitude are 39.736959 -82.191521. Directions to the south site are as follows: from New Lexington travel east on Tunnel Hill Rd, then turn left onto Township Road 364/Hunter Drive. After about 1,400 feet turn right onto the driveway of the privately owned farm at 2265 Township Road 364. Continue on this unpaved access road for about 1,300 ft until the fence/cattle gate. Once through the gate turn left and travel north along the fence for about 500 ft, then turn right and travel through the field east-southeast for about 1,300 feet to reach the Rehoboth Tributary. The south site's latitude and longitude are 39.724782, -82.186862. The Rush Creek watershed contains acres of previously mined, unreclaimed land. As a result of the exposed mine spoils present in the area, the surface waters are heavily impacted by acid mine drainage (AMD). This project will include work in streams impacted by AMD, with the objective of installing flow monitoring devices at three locations. At the north site, there are two small tributaries that meet and form the main Rehoboth Tributary. In these streams, which will be referred to as the Perry State Forest Tributary and the Reservoir Outlet Tributary, 18" fiberglass Parshall Flumes and stream level gauges will be installed. At the southern site, a stream level gauge will be installed into the Rehoboth Tributary channel. Construction: The scope of work involves clearing, dewatering, excavation, stone placement, vinyl sheetpiling installation, flume installation, concrete, stream level gauge installation and revegetation. The project officer for this project is Sarah Maj in the Zaleski Office (614) 867-3655, and the project engineer is Brian Jacoby, P.E. in the Columbus Office (614) 965-0451. The Director of Natural Resources reserves the right to reject any or all bids, or toaccept the bid which embraces such combination alternate proposals as may promotethe best interest of the State.
Award
Amusement and Recreation
$69,375.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2025
August 28, 2025
Multiple Locations, Columbus, OH
Related To This Project
Columbus, OH
Bid Date: Jul 31 2025
Columbus, OH
Bid Date: Jul 29 2025
Columbus, OH
Bid Date: Jul 31 2025
Columbus, OH
Bid Date: Jul 25 2025
Columbus, OH
Bid Date: Jul 22 2025
Columbus, OH
Bid Date: Jul 11 2025
Columbus, OH
Bid Date: Jul 15 2025
Columbus, OH
--
Columbus, OH
--
Columbus, OH
Bid Date: Jul 14 2025
Columbus, OH
Bid Date: Aug 14 2025
Columbus, OH
Bid Date: Jul 09 2025
Columbus, OH
Bid Date: Jul 24 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
