BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 22, 2025 at 8:00 PM

Updated September 24, 2025

This is a service / maintenance or supply contract in Batavia, Illinois. Contact the soliciting agency for additional information.

RFP#369466 - Asbestos Abatement Services The Contractor shall provide all labor, materials, equipment, and supervision necessary to perform asbestos remediation services as specified. 1. This work is to be performed to ensure the safe removal, handling, and disposal of asbestos containing materials (ACMs) in compliance with federal, state, and local regulations. Work may include, but is not limited to: a. Removal of asbestos-containing thermal system insulation. b. Removal of asbestos-containing flooring systems and associated mastic/glue via chemical or mechanical removal techniques. c. Removal of asbestos-containing surfacing materials such as spray-applied insulation and plaster wall/ceiling systems. d. Removal of asbestos-containing wallboard systems and other miscellaneous asbestos containing materials. e. Removal of asbestos-containing gasket material from pipe flanges. f. Removal of asbestos-containing materials from boilers, hot water heaters, furnaces, and other equipment. g. Removal of Transite utility lines in excavations. h. Removal of asbestos-containing paints. i. Removal of vermiculite insulation and asbestos-containing cloth. 2. Prepare work area as required including proper containment, signage, etc. 3. Provide the safe removal of ACMs from areas indicated by FFDG. 4. Package, label, and dispose of ACMs per applicable regulations and guidelines. 5. Decontaminate work areas, personnel, and equipment following abatement activities. 6. FFDG will provide a construction coordinator with subject matter expertise in asbestos abatement that will work closely with the Subcontractor and trades people. 7. Post-abatement/final clean of containment (if applicable), FFDG construction coordinator will verify satisfactory completion of abatement prior to tear-down/demobilization. 8. Where post-abatement clearance air monitoring is required, air samples will be collected by the FFDG construction coordinator or a third-party environmental consultant and sent to a thirdparty, accredited laboratory for analysis. 9. The Subcontractor shall provide transportation including portal to portal travel time, inclusive of all shipping, handling, and freight costs for equipment, materials, tools, parts, and supplies. Subcontractor mobilization costs are not billable. PLACE OF PERFORMANCE Fermi National Accelerator Laboratory, Site-wide, Batavia, IL 60510

Post-Bid

Laboratories

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
454
Active Projects
243
Bidding Soon
3,355
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2025

October 23, 2025

Project location map

Multiple Locations, Batavia, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.