BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2025 at 8:00 PM

Updated September 13, 2025

Site work and paving for a road / highway in Moon Township, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work generally includes the replacement of traffic signal equipment and pedestrian improvements at the intersection of Cliff Mine Road and Summit Park Drive. The improvements include traffic signal equipment, signs, and pedestrian curb ramps. This project was financed [in part] by a grant from the Pennsylvania Department of Transportation Green Light Go Program Questions Due Date: Jul 24th 2025, 4:00 PM EDT Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. All questions about the meaning or intent of the Bidding Documents are to be submitted via electronic . Estimated Contract Value: $110,000 - $140,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. Findlay Township reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of Findlay Township, and to reject any or all proposals.

Award

Roads / Highways

$127,872.00

Public - City

Paving, Site Work

6

13

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
238
Active Projects
130
Bidding Soon
2,096
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 1, 2025

Project location map

Summit Park Dr & Cliff Mine Rd, Moon Township, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.