Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 11, 2025
Site work and paving for a civil project in Auburn, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The City of Auburn is soliciting Proposals from qualified consulting teams to provide professional services for the design, environmental permitting and approvals, cultural & historical review, and construction support for the Downtown Bike to Transit (10th Street NE/NW), CP2509. The City's estimate of the contract associated with this RFP ranges from $150,000 to $250,000 excluding future phases and optional work. Questions regarding this solicitation should be directed to Aleksey Koshman, Project Engineer, by email only at akoshmanwa@auburnwa. gov. Additional information related to this RFP may be posted to the City's website no later than July 3, 2025. For guidance on proposal content and the criteria used for consultant selection and evaluation, refer to the section below titled Selection Process and Evaluation Criteria.. Although the use of subconsultants is recognized as being necessary for a multidiscipline project, the City's preference is for the lead consultant to have the majority of the work performed in-house. PROJECT DESCRIPTION This project will improve the 10th Street NE/NW corridor between B Street NW and Auburn Way North by converting the existing four-lane roadway into a three-lane configuration, consisting of one travel lane in each direction, a center two way left turn lane, and buffered bike lanes. These enhancements aim to improve safety, access, and multimodal mobility. Intersection upgrades include removing the east/west stop control at A Street NE and installing Rectangular Rapid Flashing Beacons (RRFBs) and refuge islands at the north-south crosswalks to improve pedestrian safety. The traffic signal at D Street NE will be modified to match the updated cross section, and the entire corridor will receive a grind and overlay. In conjunction with the transportation improvements, the project will replace approximately 58 feet of existing 8-inch storm sewer with a new 12-inch pipe to increase drainage capacity. Existing catch basins will be preserved unless their replacement is necessary for pipe replacement. SCOPE OF WORK The design contract will include project management, environmental approvals and permitting, cultural and historical survey, preparation of contract plans, specifications, and estimates at the 30%, 90% and final review levels; "overthe-shoulder" reviews between the 30% and 90% review levels, and bidding/construction assistance. SELECTION PROCESS AND EVALUATION CRITERIA Each proposal is limited to a maximum of 8 numbered letter sized pages of content (excluding only the cover and any dividers) (minimum font size 10 Arial) and should address each criteria element listed below. A committee of City personnel will evaluate and rate the proposals on the following criteria, weighted as indicated: 1. Project Team Qualifications (30%) Identify the Project Team (those who will be actively working on this project). Include an organizational chart and identify any sub-consultants. Discuss the proposed Project Team's expertise and experience with 3 similar projects within the last 10 years. Please include the following information for each project: a. Project name and location b. A brief description of the project c. Provide the total project costs d. Project Team Member roles in the project e. A project reference and contact phone number 3. Lessons Learned (15%) Describe specific lessons learned by your firm/team regarding similar projects and what those lessons learned taught the team. 4. Quality Assurance / Quality Control Plan (10%) Describe your firm's process/procedures for providing quality assurance/quality control throughout the life of the project. 5. Project Schedule Management (15%) Discuss how the Project Team will meet the proposed schedule shown in the Project Description section above. Describe your team's general approach towards schedule management and availability of the team members. 6. Revisions to Draft Scope of Work/Consultant Agreement Template (15%) A preliminary draft scope of work and the City's template consultant agreement are included in the supplemental RFP documents. Provide any requested additions, deletions, or revisions you may request to these documents if you were awarded this contract. Please note that modifications to the City's consultant agreement template are generally discouraged. Following the evaluation of the Proposals, the City will interview up to 3 of the prospective consultants. Those firms selected for interview will have the opportunity to present their past experience with similar projects and overall project approach. TERMS AND CONDITIONS The City of Auburn reserves the right to reject any and all Proposals and to waive irregularities and informalities in the submittal and evaluation process. This solicitation for Consultant Services does not obligate the City of Auburn to pay any costs incurred by respondents in the preparation and submission of a Proposal. This solicitation does not obligate the City of Auburn to accept or contract for any expressed or implied services. Furthermore, the City of Auburn reserves the right to award the contract to the next most qualified Consultant if the selected Consultant does not execute a contract within thirty 30 days after the award of the proposal. The City of Auburn in accordance with Section 504 of the Rehabilitation Act (Section 504) and the Americans with Disabilities Act (ADA), commits to nondiscrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by calling 253-931-3010. The City of Auburn, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
Conceptual
Roads / Highways
$250,000.00
Public - City
Paving, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 24, 2026
10th St NE, Auburn, WA
Related To This Project
Auburn, WA
Bid Date: Aug 07 2025
Auburn, WA
Bid Date: Jul 30 2025
Auburn, WA
Bid Date: Aug 13 2025
Auburn, WA
Bid Date: Aug 27 2025
Auburn, WA
Bid Date: Oct 01 2025
Auburn, WA
Bid Date: Sep 22 2025
Auburn, WA
Bid Date: Oct 21 2025
Auburn, WA
Bid Date: Jul 01 2025
Auburn, WA
Bid Date: Jul 10 2025
Auburn, WA
--
Auburn, WA
Bid Date: Jun 12 2025
Auburn, WA
Bid Date: Jun 10 2025
Auburn, WA
Bid Date: Apr 10 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
