BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated November 14, 2025

Site work and paving for a mixed-use development in Saint Cloud, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of November 13, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** The Edgewater West Community Development District (District) hereby requests proposals from firms to provide labor, materials, equipment, and construction services necessary for the Districts Neighborhood Road Collector Roadway Civil Site Work (Project). The project consists of four roadway segments depicted as Streets AA, AH, AJ, and AK, and collectively known as the Neighborhood Connector Roads. Neighborhood Connector Roads Project Overview: The Project is located north of Toho Shores Drive (aka Wetland Crossing Road) within the Edgewater West development area in St. Cloud, Florida. The portion of Toho Shores Drive to which the subject project connects is currently under construction The project consists of approximately 5,600 LF of two-lane undivided roadway with 11-foot travel lanes, seven-foot parallel parking spaces, five-foot and six-foot sidewalks, and a ten-foot trail for a portion of the roadway. Additionally, the project will include potable water, reuse, and wastewater utilities along with a stormwater management system. The potable water main will consist of approximately 6,970 LF of 8-inch PVC water main constructed to Toho Water Authoritys standards. The potable water main includes the associated valves, hydrants, and fittings, and will connect to an 8-inch stub-out from Toho Shores Drive on the south and terminate with a stub-out for future connection on the north. Additionally, several connections for future development are included along the length of the proposed roadway. The reuse main will consist of approximately 6,440 LF of 6-inch PVC reuse main constructed to Toho Water Authoritys standards. The reuse main includes the associated valves and fittings and will connect to an 8-inch stub-out (with an 8- inch x 6-inch reducer) from Toho Shores Drive on the south and terminate with a stub-out for future connection on the north. Additionally, several connections for future development are included along the length of the proposed roadway. The force main will consist of approximately 1,567 LF of 10-inch, 2,845 LF of 6-inch, and 15 LF of 4-inch PVC force main constructed to Toho Water Authoritys standards. The force main includes the associated valves and fittings and will connect to an existing 10-inch stub out from Toho Shores Drive on the south and terminate with a stub-out for future connection on the north. Additionally, several connections for future development are included along the length of the proposed roadway. Question Deadline 08/12/2025 at 12:00 PM ET Any and all questions relative to this RFP or the Project shall be directed in writing by e-mail only to Shawn Hindle P.E., District Engineer, at shindle@hansonwalter.com, Craig Wrathell, District Manager, at wrathellc@whhassociates.com, and Michael Eckert, District Counsel, at Michael.Eckert@KutakRock.com. No phone inquiries please.

Post-Bid

Water / Sewer

$600,000.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
11
Bidding Soon
1,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2025

October 9, 2025

Project location map

Toho Shrs Dr, Saint Cloud, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.