BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and new construction of a playground / park / athletic field in Saint Louis, Missouri. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

As of August 19, 2025, this project has not yet been awarded. A timeline for the award has not yet been established. The Project consists of the construction of demolition of existing restroom building and construction of new restroom building complete with new toilet fixtures. Any other technical questions should be directed to the Architect, Chiodini Associates, 1401 S. Brentwood Blvd., Suite 425, St. Louis, MO 63144. All Bids Must Be Accompanied by a Cashier's Check or Certified Check Drawn on a Solvent Missouri Bank or Trust Company Made Payable to the City, or a Bid Bond Issued by a Surety Licensed to Conduct Business in the State of Missouri, in the Amount of Not Less Than Ten Percent (10%) of the Total Bid. The Bid Bond May Be Retained by the City as a Guarantee That if the Proposal is Accepted, the Bidder Will Execute the Contract and File an Acceptable Performance and Payment Bond Within Seven (7) Days After Notice of Award of the Contract. The City Encourages the Contractors to Follow the Policy Recommendations of Federal Committee on Apprenticeship of the United States Department of Labor. Not Less Than the Prevailing Hourly Rate of Wages Shall Be Paid to All Workers Performing Under This Contract in This Area According With the Rates Determined by the Department of Labor & Industrial Relations of the State of Missouri. The City Reserves the Right to Reject Any and All Bids, and to Waive All in-formalities in Bids. No Bid May Be Withdrawn for a Period of Sixty (60) Days. The Contractor Shall Abide by All Applicable Missouri Statutes Concerning Prompt Payment, Osha Safety Programs, Gbp-verify, & Other Applicable Laws. The City Will Make Its Decision Within 60 Days After Opening of the Bid.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Site Work

13

15

13

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
0
Bidding Soon
789
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2025

August 20, 2025

Project location map

4301 Calvert Ave, Saint Louis, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.