Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 18, 2025 at 7:00 PM
Updated November 19, 2025
Demolition, site work, asbestos abatement and new construction of an educational facility in Baton Rouge, Louisiana. Design plans call for site work for a educational facility; for the construction of a 148,000-square-foot educational facility; for the demolition of a educational facility; and for asbestos abatement for a educational facility.
As of September 29, 2025, this project is in the design phase. A construction manager is expected to be selected in the late fourth quarter of 2025. Schematic design will last from August to November of 2025, design development will last from December to February 2026, construction documents drafting will last from March to June of 2026, the project will be bid out and permitted from June to July of 2026, procurement will last from August to November of 2026, and construction will last from November of 2026 to August of 2028. *Previous solicitation listed below for reference:* FPC is issuing this RFQ to select a single entity to provide professional architectural and engineering services to support FPC with full services for the Project Management of: Construction Management & Engineering Sciences Building Louisiana State University This project consists of a new approximately 148,000 s. f. multistory building to house the Construction and Advanced Manufacturing program which will serve the growing Construction Management curriculum on the campus of Louisiana State University in Baton Rouge. The program accounts for spaces including, but are not limited to, classrooms, laboratory classrooms, material labs, CNC shop, enviro chamber, clean room, unstructured gathering spaces for independent and group study, faculty and staff offices, along with all associated building support spaces. All design including building structure, envelope, roof, all associated exterior and interior finishes, interior, wayfinding, and exterior (including donor) signage, mechanical, electrical power and lighting, audio-visual systems, data/telephone systems, plumbing, sprinkler, fire alarm, building controls management, security cameras, access control, furniture/fixtures/equipment and the infrastructure necessary for the installation and construction of these elements are to be included in the project. The demolition and abatement of existing structures on the site is included in the project. Question Deadline Oct 24, 2025 Written inquires or requests for site visits should be directed to: FPC-RFQ@la.gov Attn: Roy Dowling, RFQ Coordinator State’s Response to Written Questions Oct 29, 2025 The target estimate for the Guaranteed Maximum Price (GMP) for this Project is $85,995,000.00 and the target date for completion is August 1, 2028 Selection/Recommendationof Proposer(s) Interview/Presentation AnnouncedNov19, 2025 Shortlist Interviews/Presentations......................................................................Dec 2, 2025 Division of Administration Approval of Committee Selected CMAR..............Dec 5, 2025 CMAR selection announcement Target Date................................................Dec 8, 2025 CMAR pre-construction design-assist kickoff meeting...................................Dec 11, 2025 Part A Contract execution target date ..............................................................Dec 12, 2025 Award of CMaR Part A: Pre-Construction (Design Assist) Services.. Dec 5, 2025 Advanced Construction Start (ACS) TBD GMP Proposal Due - Part B: Construction Services.. Sept 31, 2026 Award of Part B: Construction Services.... Nov 1, 2026 Substantial Completion - Part B: Construction Services. Aug 1, 2028 The method of Contractor Selection has not been Determined at this time.
Design
Educational
$85,995,000.00
Public - State/Provincial
Asbestos Abatement, Demolition, New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 12, 2025
To Be Determined, Baton Rouge, LA
Related To This Project
Baton Rouge, LA
Bid Date: Sep 16 2025
Baton Rouge, LA
Bid Date: Jul 29 2025
Baton Rouge, LA
Bid Date: Jul 24 2025
Baton Rouge, LA
Bid Date: Aug 19 2025
Baton Rouge, LA
Bid Date: Aug 12 2025
Baton Rouge, LA
Bid Date: Aug 12 2025
Baton Rouge, LA
Bid Date: Aug 12 2025
Baton Rouge, LA
Bid Date: Jul 29 2025
Baton Rouge, LA
--
Baton Rouge, LA
Bid Date: Jan 08 2026
Baton Rouge, LA
Bid Date: Jul 03 2025
Baton Rouge, LA
Bid Date: Jul 31 2025
Baton Rouge, LA
Bid Date: Aug 01 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
