BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Demolition and site work for a residential development in York, South Carolina. Completed plans call for the demolition of a residential development; and for site work for a residential development.

The scope of work includes: o The complete demolition and disposal of one (1) vacant structure located within the City limits. o The structure is approximately 1,000 square feet and is in a state of advanced deterioration. o The bid amount shall include all labor, equipment, materials, and services necessary to fully complete the work described. 2. Specific Work Requirements o Demolition and Removal o Remove all construction materials above and below grade, including collapsed debris, partially upright structures, footings, foundations, and any buried materials. o On-site materials include rotting wood, broken glass, siding, shingles, and general construction debris. o Demolish and dispose of all remnants of the original structure in accordance with applicable laws. o Utility Termination o All underground utilities (water, gas, sewer) must be properly disconnected and sealed at the street right-of-way. o The work shall include the removal of all buried pipes and infrastructure associated with the former structure. o Site Access and Vegetation Clearing o Due to limited access, the contractor may be required to: Remove or trim overgrown vegetation and vines. Remove small-to-midsize trees that have grown into previous access paths. Perform bush hogging and stump/dead tree removal to facilitate equipment access and ensure thorough site clearing. o Site Restoration o Following demolition and debris removal, the lot must be: Cleared of all remaining debris and vegetation. Leveled with clean fill and seeded to promote ground cover and prevent erosion. Left in a clean, safe, and stable condition suitable for future use or redevelopment. 3. Environmental Responsibility o The contractor shall be responsible for all environmental assessments, testing, monitoring, and/or disposal associated with the project. o Any hazardous materials discovered during demolition must be handled in compliance with all local, state, and federal regulations. 4. Permitting and Coordination o The contractor is responsible for obtaining all necessary permits, including demolition permits and utility disconnect authorizations. o Coordination with City staff and utility providers will be required prior to the commencement of work. 5. Final Deliverables o The contractor shall leave the lot clean, level, and seeded, with all debris and overgrowth removed. o Final site inspection and approval by City staff will be required prior to project closeout. 6. Timeline o Bidders shall submit a proposed project start date and timeline for completion as part of their proposal. Proposal Requested The City of York is in search of a Contractor for the Demolition of a residential unit, parcel number 0700202017, located at 47 Magnolia Street, York, SC 29745. See the Project Scope included within this RFP for complete details. Project Background The property located at 47 Magnolia Street, York, SC 29745 has been identified by the City of York as unsafe, uninhabitable, and beyond reasonable repair. Due to its deteriorated condition and the associated public safety and health concerns, the City initiated the formal process to declare the structure derelict and proceed with demolition. The matter was first brought before City Council during a City Council Workshop held on April 22, 2025, where staff presented initial findings and concerns regarding the structure's condition. Following that discussion, the City scheduled a public hearing, which was held on June 3, 2025 during the regular Council meeting. After receiving public input and reviewing the staff's report, City Council officially declared the property derelict and authorized its demolition. Requests for additional information and questions must be submitted in writing via letter or email to: Sarah Ramirez, Capital Program Manager, City of York, PO Box 500, York, SC 29745, or email: sramirez@yorksc.gov. The deadline for additional information and questions is Monday, Jul 21, 2025, at 12:00 pm. The City of York reserves the right to reject any or all of the proposals and/or to waive informalities for any or all proposals. Any proposal submitted MUST be signed by an individual authorized to bind the offeror.

Award

Residential Subdivision

$17,376.00

Public - City

Demolition, Site Work

7

6

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
135
Bidding Soon
1,788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2025

August 27, 2025

Project location map

47 Magnolia St, York, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.