BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 2, 2025 at 8:00 PM

Updated September 3, 2025

Site work for a transportation facility in Pasco, Washington. Completed plans call for site work for a transportation facility.

Questions and other correspondence related to the bid and project shall be directed to: HDR Engineering, Inc., Paul Weber, 835 North Post Street, Suite 101, Spokane, WA 99201-2126, 509-343-8511, paul.weber@hdrinc.com Including WA State Sales Tax This Contract provides for the establishment and construction of an industrial rail lead track that reaches the southerly half of Port of Pasco's Reimann Industrial Center in North Pasco and includes railroad roadbed construction, at-grade signalized railroad crossing of Railroad Ave, track and special track work construction and other work as described in the Contract Documents. The project includes 42 Base bid items and 2 alternate items: 7209 CY Strip Topsoil, 39851 CY Roadway Exc. Inc. Haul, 20011 CY Embankment Compaction, 27227 CY Dispose Excess Materials, 6135 CY Furnish and Install Subballast, 298 LF Plain St. Culv. Pipe. 0.109 IN. TH. 24 IN. DIAM., 126 LF 6" PVC Perf. Pipe, 16 LF 6" PVC Solid Pipe, 607 SY Const. Geotextile for Separation, 2921 SY Const. Geotextile for Ditch Lining, 454 SY Removing Asphalt Conc. Pavement, 84 TN of HMA CL 1/2 In. PG64-28H, 589 CY of Crushed Surfacing Base Course, 86 CY of Crushed Surfacing Top Course, 2 EA Beam Guardrail Type 31 Non-Flared Terminal, 148 LF Beam Guardrail Type 31, 2 EA Beam Guardrail Anchor Type 11, 792 CY Quarry Spalls, 8.5 AC Seeding Fertilizing and Mulching, 221 TF Furnish and Install 10' Wood Tie Track, 109 TF Furnish and Install 8.5' Wood Tie Track for Crossings, 2 EA Furnish and Install #9 Turnouts, 2 EA Furnish and Install Sliding Derail with Wheel Crowder, 1 EA Furnish and Install Double Switch Point Derail, 1 EA Furnish and Install Earthen Bumper, 130 TF of Furnish and Install Concrete Panel Crossing, 64 TF Furnish and Install Timber Panel Crossing, 1068 LF Furnish and Install Walkway, 2 EA Furnish and Install Whistlepost, and (alternates) 7078 TF Furnish and Install Wood Tie Track or 7078 TF Furnish and Install Concrete Tie Track. Lump sum bids for Mobilization, SPCC Plan, Erosion Control and Water Pollution Prevention, Project Temp Traffic Control, Railroad Grade Crossing Signal System, Signage and Pavement Markings, Roadway Surveying, and Record Drawings.

Award

Transportation Terminals

$3,977,209.00

Public - City

Site Work

132

6

49

8

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
2
Bidding Soon
196
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.